DMJOIC201EN - v2
VISIO C2H OPERATOR -
INSTALLATION MANUAL
10
R
ef
er
en
ce
v
er
tic
al
Fig.
3.10
Fig.
3.9
i
Screw main profile to the UPN as shown in the
diagrams.
Fig.
3.10
Fig.
3.9
Nuts & bolts
Nuts & bolts
DIN6923 M8
SO7380 M8×20
i
Drill where marked along the length of the UPN at Ø8,
as shown in the diagrams.
Fig.
3.8
Fig.
3.7
Herrramientas
Drill Ø8
Fig.
3.8
Fig.
3.7
Fig.
3.5
i
Drill holes in the beam using the main profile
as template, as shown in the diagrams.
Fig.
3.6
Fig.
3.5
Fig.
3.6
3.3.2 Drill.
3.3.1 Introduce and mark.
3.3.3 Screw.
3.3 MAIN PROFILE ASSEMBLY