![Manitowoc 999 Service And Maintenance Manual Download Page 183](http://html.mh-extra.com/html/manitowoc/999/999_service-and-maintenance-manual_701168183.webp)
Reference
Only
Manitowoc
Published 05-16-17, Control # 233-03
5-7
999 SERVICE/MAINTENANCE MANUAL
HOISTS
5
Installation
The block-up limit controls must be installed according to
Boom Wiring, Limits and Load Indicator Electrical Assembly
drawing in the 999 Operator Manual.
for installation of the weights.
Storing Electric Cable
The electric cables for the boom, fixed jib, and luffing jib are
long enough to accommodate the maximum length of each
attachment.
Store the excess cable for the boom and luffing jib on the reel
mounted on either butt (
with a locking pin. Disengage the locking pin to allow the reel
to be wound. Engage the locking pin to lock the reel in
position. The power supply cable to the reel must be
disconnected before the reel can be wound.
Store the excess electric cable for the fixed jib by winding it
around the brackets on the fixed jib butt (
FIGURE 5-4
#82 Boom Point Shown
All Other Boom and
Jib Points Similar
Weight
Lift Block
Weight Ball
Load Block
Limit Switch
Assembly
Upper Boom
Point
Lower Boom
Point
Limit Switch
Assembly
Chain
8 ft (2.4 m)
Chain
6 ft (1.8 m)
Weight
Lift Plates
A873
Summary of Contents for 999
Page 1: ...R e f e r e n c e O n l y Service Maintenance Manual Manitowoc 999 ...
Page 2: ...R e f e r e n c e O n l y ...
Page 4: ...R e f e r e n c e O n l y THE ORIGINAL LANGUAGE OF THIS PUBLICATION IS ENGLISH ...
Page 297: ...R e f e r e n c e O n l y ...
Page 298: ...R e f e r e n c e O n l y ...