1-13
area of possible voltage step potential, barriers shall be provided at ground level to prevent this from occurring. Appropriate
warning signs shall be displayed on the barriers. Pedestrians should be barricaded from the area of possible voltage step
potential (see Figure 6.19.4) in the vicinity of the crane and associated equipment.
(f) Person to platform contact Only the platform operator shall be in contact with any part of the platform
during operation.
(g) Earthing systems An appropriate earthing system shall be fitted to the platform and shall be in use.
Operators and those working in proximity to the platform shall be advised of the limits of the effectiveness of the earthing
equipment.
NOTE: The purpose of the earthing system is to provide an alternate path to earth to minimize risks to personnel and plant,
and it may not be likely to trip circuit breakers that form part of the electricity transmission system.
(h) High visibility bunting Where high visibility bunting is applied to the conductors, it shall not be regarded as
insulation.
647414 EN (27/05/2015)
Summary of Contents for 160 ATJ E3
Page 4: ...REAR 160 ATJ E3 FRONT 647414 EN 27 05 2015 ...
Page 5: ...180 ATJ 2 E3 REAR FRONT 647414 EN 27 05 2015 ...
Page 6: ...647414 EN 27 05 2015 ...
Page 8: ...1 2 647414 EN 27 05 2015 ...
Page 20: ...1 14 FIG C1 3 CLEARANCES FROM LIVE AERIAL CONDUCTORS 647414 EN 27 05 2015 ...
Page 29: ...1 23 647414 EN 27 05 2015 ...
Page 35: ...1 29 647414 EN 27 05 2015 ...
Page 46: ...1 40 647414 EN 27 05 2015 ...
Page 47: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647414 EN 27 05 2015 ...
Page 48: ...2 2 647414 EN 27 05 2015 ...
Page 71: ...2 25 647414 EN 27 05 2015 ...
Page 112: ...2 66 647414 EN 27 05 2015 ...
Page 113: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647414 EN 27 05 2015 ...
Page 114: ...3 2 647414 EN 27 05 2015 ...
Page 160: ...3 48 647400 EN 01 02 2015 ...