3-46
G5 - FREEWHEELING
ACTIVATE
If the lifting platform must be towed, follow the instructions below.
The lifting platform may only be towed a short distance, necessarily by a vehicle with significant
braking power so that it is capable of holding it and by means of a connecting bar between the
two vehicles.
1 - Chock the lifting platform.
2 - Hydrostatic declutching
Warning: before conducting this operation, take the necessary precautions; the machine will no
longer have any brakes.
- Remove the bonnet.
- Screw in the HP restrictors 1 (Fig. G5/1) on the hydrostatic pump up to the sticking point + 1
and a half turns (No. 13 wrench and No. 6 hex wrench).
3 - Rear axle mechanical declutching
- Loosen the screw 1 (Fig. G5/2), without removing it.
- Remove the pin Rep.2 (Fig. G5/2).
- Tighten the screw 1 (Fig. G5/2).
- Loosen the screw 1 (Fig. G5/3), without removing it.
- Remove the pin 2 (Fig. G5/3).
- Tighten the screw 1 (Fig. G5/3).
Warning: after this operation, remember to remove the mechanical anti-skid system.
G5/1
G5/2
G5/3
1
1
1
2
1
2
647400 EN (01/02/2015)
Summary of Contents for 160 ATJ E3
Page 4: ...REAR 160 ATJ E3 FRONT 647414 EN 27 05 2015 ...
Page 5: ...180 ATJ 2 E3 REAR FRONT 647414 EN 27 05 2015 ...
Page 6: ...647414 EN 27 05 2015 ...
Page 8: ...1 2 647414 EN 27 05 2015 ...
Page 20: ...1 14 FIG C1 3 CLEARANCES FROM LIVE AERIAL CONDUCTORS 647414 EN 27 05 2015 ...
Page 29: ...1 23 647414 EN 27 05 2015 ...
Page 35: ...1 29 647414 EN 27 05 2015 ...
Page 46: ...1 40 647414 EN 27 05 2015 ...
Page 47: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647414 EN 27 05 2015 ...
Page 48: ...2 2 647414 EN 27 05 2015 ...
Page 71: ...2 25 647414 EN 27 05 2015 ...
Page 112: ...2 66 647414 EN 27 05 2015 ...
Page 113: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647414 EN 27 05 2015 ...
Page 114: ...3 2 647414 EN 27 05 2015 ...
Page 160: ...3 48 647400 EN 01 02 2015 ...