![M&V S.r.l. Vostok 3 Use And Maintenance Download Page 7](http://html1.mh-extra.com/html/mandv-s-r-l/vostok-3/vostok-3_use-and-maintenance_3081422007.webp)
7
4. installation
MANDATORY REQUIREMENTS : the operation of the lever for coffee brewing , it is
extremely dangerous. In order to avoid the risk of harm to the operator is absolutely
necessary, before driving the lever for any reason, make sure that:
the filter holder cup is completely filled with the right amount of coffee,
the cup is safely and properly coupled to the coffee brewing unit and
the coffee machine is regularly and properly connected to the network‘s national water,
with the water shutoff valve fully open.
It ‘still strict obligatory for the user of the lever machine keeping the body at a minimum
distance of 30 cm from the range of lever’s action when the lever is operating. The
manufacturer declines all responsibilities for any damage occurring to persons and / or
property due to negligent behavior by the user that does not comply with the mandatory
requirements contained in this manual. Should the cup not properly couple the group
brewing unit, is strictly forbidden to continue to use the machine in such conditions.
•
The installation must be carried out by authorized ACS-M&V S.r.l. technical personnel.
•
The coffee machine is delivered in a suitable packing. The packing contains the machine and its
accessories, the user manual and the conformity declaration. After opening the packing, check the
proper condition of the coffee machine and its components. In case of doubt, do not use the
appliance, and contact ACS-M&V S.r.l.
•
All of the packaging must be carefully conserved in case the machine needs to be transported in
the future.
•
The machine should be placed on a perfectly horizontal plane sufficiently sturdy to support the
weight of the machine, with a sufficient clearance around it to dissipate the heat generated during
its operation.
•
Do not install the espresso coffee machine in places where cleaning is likely to be carried out with
jets of water. Do not immerge the unit in water to clean it.
•
For safety against hazards related to electrical currents, keep the machine away from sinks, tubs,
aquariums, taps, and areas that are wet or where water may splash.
•
The machine creates heat. Therefore it needs to be placed in a room that is sufficiently ventilated
to ensure heat dissipation. Keep the machine away from sources of direct heat.
•
Make sure that the voltage of the power socket does not differ from that indicated on the technical
data and on the identification tag on the machine. If the voltage is different, do not connect the
machine. This may be dangerous and may damage the unit.
4.1 Equipment provided
The machine packing contains the equipment kit, which includes the following items:
– filter cups with filter restraint ring
– filters for filter cups (single and double doses)
– spouts for filter cups (single and double doses)
– press for ground coffee
– rubber tube with stainless steel mesh for water connection (water circuit - water softener)
– cleaning brush for serving units
4.2 Water mains set-up
FEEDING LINE
Bring the water feeding tube (of at least 3/8” diameter) up to the machine and install an on-off valve
(preferably of 3/8” ball type) that allows a rapid opening and closing operation. The machine should be
connected to the water mains using the tube supplied with it. Do not connect the machine with used
tubes.
DRAIN LINE