background image

8

10

20

30

40

80 100 120 140 160 180 200 220 240 260 280 300 320

L

wA

to the pipe for VBM-V 160

del.p=100Pa

del.p=250Pa

V (m

3

/h)

L

w

A

(d

B

(A

))

10

20

30

40

60 70 80 90 100 110 120 130 140 150 160 170 180 190

L

wA

to the pipe for VBM-V 125

del.p=100Pa

del.p=250Pa

V (m

3

/h)

L

w

A

(d

B

(A

))

10

15

20

25

30

35

40

30

40

50

60

70

80

90 100 110 120 130 140

L

wA

to the pipe for VBM-V 100

del.p=100Pa

del.p=250Pa

V (m

3

/h)

L

w

A

(d

B

(A

))

0

2

4

6

8

10

12

14

16

18

20

30

80

130

180

230

280

330

VBM-V100

VBM-V125

VBM-V160

Δ

p

 (

P

a)

V (m

3

/h)

Summary of Contents for VBM-V Series

Page 1: ......

Page 2: ...ies assembly operation and maintenance Description 2 Construction 2 Size and weight 3 Installation and placement 4 Basic parameters 5 Electric elements connection diagram 5 Pressure losses 8 Noise dat...

Page 3: ...size Each ventilation box may be controlled by a separate remote control In the box there is a power supply and control unit installed for the air flow control with a flexible connection with euro ty...

Page 4: ...3 480 120 240 392 220 100 552 98 44 1250 480 120 240 392 220 100 552 123 44 1250 520 130 260 456 245 107 552 158 32 1400 Removable lid 24 26 31...

Page 5: ...d anchors with load corresponding to the box weight Ceiling installation should be always performed by a removable lid in a downward direction i e to the floor Vertical wall fixing is possible in the...

Page 6: ...RADE 2 GRADE MAX Setting of ventilation intensities for respective grades is within the range of 0 10V MIN 2V 1 GRADE 4V 2 GRADE 6V MAX 10V Remote control is pre set from the factory Different require...

Page 7: ...et for 10min Non presence mode with optional ventilation intensity and time of operation Optional ventilation grades 5 grades Change of setting parameters protected by password Designed for mounting i...

Page 8: ...e and select PRO confirm by select ON or OFF turn time schedule off or on select ON push large digits on the display will show PR01 small digits will show the beginning of the first time interval push...

Page 9: ...60 70 80 90 100 110 120 130 140 150 160 170 180 190 LwA to the pipe for VBM V 125 del p 100Pa del p 250Pa V m3 h L wA dB A 10 15 20 25 30 35 40 30 40 50 60 70 80 90 100 110 120 130 140 LwA to the pipe...

Page 10: ...18 17 14 6 4 D dB 12 11 20 19 20 19 11 6 Shell of the VBM V ventilation box is made of steel zinc plates Box is equipped by flanged with edge rubber sealing Flow rate controllers shells and valve damp...

Page 11: ...er provides a warranty of 24 months for the box from the date of its shipment Such warranty will not apply in case of box use for any other purpose equipment and working conditions as allowed by this...

Page 12: ...ght for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 26724 Hostomice Czech Republic Tel 420 311 706 706 Fax 420 311 584 810 311 584 382 E Mail man...

Reviews: