14. EFFICIENT  USE OF BIOLERS IN TERMS OF ENERGY CONSUMPTION

Points to be considered about efficient energy use in houses, are stated below:

There is %25-40 heat loss on the wall of buildings. The first precaution for

 

energy efficiency and low fuel consumption, must be enhancing the

 

isolation. For this purpose, outer walls of the building must be isolated from

 

outside or inside.

There is %20- 25 heat loss from the roofs.Heat isolation must be done in

 

cold roofs lofts  

according

 to 

EN

 standarts.

Air and moisture leakage of the doors and windows in house must be

 

provided with proper materials.

Double- glazed windows and doors, making shutter and blinds will

 

decimate the heat loss.

If there is air and moisture leakage connection points of door and window

 

frames and walls will be filled up with filling material  plaster,paste or

 

silicone.

Outer doors or other doors  belong to the unwarmed places (bathroom,

 

corridor) must be closed as far as possible.

Most of the cold air flow becomes from under the door. Spaces under the

 

doors can be filled with an elastic material filling.

Building doors shouldn't left open, double door or automatic closing

 

systems must be applied.

It is recommended to clean the windows for receiving more sunlight, close

 

the curtains at nights, leave south, west, southwest and southeast position

 

curtains open that  are receiveing direct sunlight at winter time.

Temperature shouldn't be increased more than adequate in winter time.

When the temperature is too much, heater's regulation must be down

 

instead of opening windows.

Moist air retain the heat well. In order to increase the felt temperature full

 

of 

water pot can be put on radiators. In this way place can be moisturised.

    

%50-55 air moisturing provides reducing vaporization and provides feeling

 

temperature 2-3 ºC more.

Marble etc. materials and covers shouldn't place on and laundry shouldn't

 

make dried on radiators.

One side aluminium covered  thermal insulting boards shouldn't be placed 

behind

 

the radiators and between radiator and wall.

In unused parts of the house, temperature adjustment must be in minimum 

level.

 

Also isolation of hot water pipes must be done in unheated parts of 

the house.

Summary of Contents for Epsilon ECO 24

Page 1: ...MMAKTEK CONDENSING BOILER TS EN ISO 9001 2015 Please Keep Please Read rev no 01 30 05 2019 USER S GUIDE Epsilon ECO 24 kW 30 kW...

Page 2: ...N CONNECTION DIAGRAM 3 8 INSTALLATION CONNECTIONS 3 9 CHIMNEY CONNECTION 4 FLUSHING TO THE SYSTEM AND MONITORING WATER PRESSURE 5 START UP 5 1 PRE CONTROLS BEFORE START UP 5 2 START UP OPERATION 5 3 P...

Page 3: ...benefit from it Maktek Epsilon Eco Boiler provides you safe and comfortable life with conscious utilization Please keep this manual for using when needed We are stronger with you ATTENTION THESE DEVIC...

Page 4: ...olated open wires Do not leave tools or staff on the device Injury resulted from falling objects from device becuse of vibration Harms on things or animals resulted from falling objects from device be...

Page 5: ...e ambient temperature is lower boiler must be isolated within a proper keeping stuff Only authorised service can intervene the all parts and sections that when leakage is observed Disconnect the main...

Page 6: ...e of a leakage firstly close the gas inlet valve and ventilate the environment then call authorised service immediately WARNING This instruction manual is extremely important and must be kept as a ref...

Page 7: ...5 2 INTRODUCTION OF THE DEVICE 2 1 APPEARANCE AND EXTERNAL DIMENSIONS...

Page 8: ...perature Sensor 10 Pressure Gauge Transducer 11 Plate Exchanger 12 Gas Valve 13 Filling Valve 14 Water Flow Sensor 15 Condensing Water Reservoir 16 Circulation Pump 17 Ignition Electrode 18 Burner 19...

Page 9: ...ired temperature flashes on the screen DHW function is OFF Note The boiler does not produce DHW TEST Mode of adjustment by AUTHORISED SERVICE B P2 KEY OFF RESET The boiler is functionally switched off...

Page 10: ...anual reset is required S6 Burning initiated boiler is running S7 No burning WARNING CODE EXPLANATION SOLUTION E04 Low or high water pressure page 22 E01 No Flame page 22 E02 Limit thermostat page 22...

Page 11: ...done properly Please make the phase neutral and ground line connection as shown on the schema 3 2 OPENING THE BOX 1 Put the box on the floor as arrows showing down and open the box by cutting packing...

Page 12: ...e there is no air circulation Wall mounted boilers must be installed vertically on a strong wall that can carry it The unit must not be installed in connection with dirty and oily flue where the kitch...

Page 13: ...ter drain inside the house At least 75 mm siphon connection should be made when connecting ii Connection can be done to a water drain outside the house The condensation water discharge connection shou...

Page 14: ...e neck It should be clean Use the pipes in accordance with the applicable rules for the discharge of condensate water Since the condensation water pH is close to 2 acidity necessary precautions should...

Page 15: ...urve When there is an excessive pressure increase at heating system the security ventile operates in order to discharge the excessive water When radiator thermostatic valves are installed in the heati...

Page 16: ...connections and must be maximum 40 cm in sidelong connections Allowed maximum chimney length is 4 m If otherwise please consult the manufacturer for technical information Important There is an air pro...

Page 17: ...closing the purgers the other one can control the pressure by standing over the boiler and close the filling valve if needed In case of water shortage in closed circuit system after running of the boi...

Page 18: ...condensation reservoir of the boiler device can run by emiting smoke for a while Make sure that fuse switch which enables the energy connection of boiler is open If the boiler has waited for a long ti...

Page 19: ...E of THE CIRCULATION PUMP 3 speed circulation pump is used in MAKTEK Epsilon Eco Boiler It is possible to set the circulation with these three speeds according to resistance required by installation E...

Page 20: ...is shut down In OFF mode automatic protective functions below are in use DHW Freezing Protection Central System Freezing Protection Pump Squeezing Protection 3 Way Valve Squeezing Protection When manu...

Page 21: ...matically Provides constant temperature comfort with full modulation system DHW production is priority at the winter mode If it is required DHW can be moved to OFF position and only central system hea...

Page 22: ...eezing Protection Function Start DHW Min Flow DHW Max Pressure DHW Min Pressure Expansion Tank Capacity Expansion Tank Capacity Before Loading Maximum Working Pressure heating system Nominal Natural G...

Page 23: ...21 8 ELECTRICITY CONNECTION SCHEMA...

Page 24: ...all the authorised service 9 2 LOW HIGH WATER PRESSURE When the pressure in the system is below 0 7 bar or above 2 5 bar the boiler does not operate and E04 warning code appears on the LCD screen What...

Page 25: ...warning code appears on LCD screen Call authorized service 9 7 When a sensor failure occurs in heating system E05 warning code appears on the LCD screen Call authorized service 9 8 When there is an o...

Page 26: ...ent usage energy saving and protect quality at the beginning Maintenance must be done by only MAKTEK Autorised Service Intervention of private services except autorised services is extremely dangerous...

Page 27: ...that occur as a result of bad dirty fuel use the use of extremely calcerous water in hot water system ideal water hardness must be 15 20 French hardness 7 Start up and interventions by people other th...

Page 28: ...fire appropriate fire extinguisher must be used When Performing Maintainance or Repair When working on the heating system or the boiler itself there should be no current on these The main switch or f...

Page 29: ...om under the door Spaces under the doors can be filled with an elastic material filling Building doors shouldn t left open double door or automatic closing systems must be applied It is recommended to...

Page 30: ...inal ambalage Moving must be done with two people by holding from the corners of the boiler box Be sure that the box is completely closed while the moving and transporting Protect the boiler from mois...

Page 31: ...Seller 10013 Street No 14 A O S B i li IZMIR TURKEY Customer care sales maktek com tr Customer Hot Line 902323280365 www maktek com tr...

Reviews: