Maktek Epsilon ECO 24 User Manual Download Page 17

15 

4. FLUSHING TO THE SYSTEM AND MONITORING  WATER PRESSURE

Water pressure of the heating system is digitally displayed on LCD screen. 

To display the pressure, turn P1 Knob to TEST position, and move P2 to 

SUMMER position on the control panel (page 7). Water pressure will be 

displayed as bar (unit of pressure).Air must be purged from radiators in the 

initial  flushing process. Please follow these steps to start initial flushing: 

1- Open all purgers in central boiler installation and radiators.

Attention:   Rotate directions of water evacuation holes and place a pot under

each purger in order to prevent environment from water damages.

2- Open the filling valve (page 12)  which is placed  underneath the boiler

and start filling water into the system.

3- Close all the purgers when blister-free water starts to come from purgers.

4- Continue to flush until the system pressure comes up to 1,5 Bar, then turn

off the filling valve.

Attention:

 It is recommended to make initial flushing with  at least 2 

people.While one person is controlling the radiators and closing the purgers, 

the other one can control the pressure by standing over the boiler and close 

the filling valve if  needed.

In case of water shortage in closed circuit system after running of the boiler, it 

is necessary to add water to system by opening filling valve. Radiators must 

be checked if there is air in them or not.

5. START-UP

Boiler must be put into service by only Tecnical Services in order to run the 

boiler efficient and safe, also for the validation of guarantee conditions.

5.1 PRE- CONTROLS  BEFORE START-UP

1.The gas type and its pressure must be controlled.

2.Automatic purger fuse on the circulation pump must be loosened.

3.The pressure inside the system must be controlled from the manometer.

The pressure must be around 1,5 Bar.

4.In order to dispose the air from all of the system , take out the screw in front

of the pump. By this way, whether the pump mill is congested or not can be

controlled and any air that is congested can be discharged.

5.Dispose the air from the purgers on radiators.

6.Discharge the air in the hot water system by turning on hot water tap.

7.Check the installation of hermetic flue kit.

8.Check whether all valves in the system are turned on.

9.Check that the accuracy of condensate drain connection.

Summary of Contents for Epsilon ECO 24

Page 1: ...MMAKTEK CONDENSING BOILER TS EN ISO 9001 2015 Please Keep Please Read rev no 01 30 05 2019 USER S GUIDE Epsilon ECO 24 kW 30 kW...

Page 2: ...N CONNECTION DIAGRAM 3 8 INSTALLATION CONNECTIONS 3 9 CHIMNEY CONNECTION 4 FLUSHING TO THE SYSTEM AND MONITORING WATER PRESSURE 5 START UP 5 1 PRE CONTROLS BEFORE START UP 5 2 START UP OPERATION 5 3 P...

Page 3: ...benefit from it Maktek Epsilon Eco Boiler provides you safe and comfortable life with conscious utilization Please keep this manual for using when needed We are stronger with you ATTENTION THESE DEVIC...

Page 4: ...olated open wires Do not leave tools or staff on the device Injury resulted from falling objects from device becuse of vibration Harms on things or animals resulted from falling objects from device be...

Page 5: ...e ambient temperature is lower boiler must be isolated within a proper keeping stuff Only authorised service can intervene the all parts and sections that when leakage is observed Disconnect the main...

Page 6: ...e of a leakage firstly close the gas inlet valve and ventilate the environment then call authorised service immediately WARNING This instruction manual is extremely important and must be kept as a ref...

Page 7: ...5 2 INTRODUCTION OF THE DEVICE 2 1 APPEARANCE AND EXTERNAL DIMENSIONS...

Page 8: ...perature Sensor 10 Pressure Gauge Transducer 11 Plate Exchanger 12 Gas Valve 13 Filling Valve 14 Water Flow Sensor 15 Condensing Water Reservoir 16 Circulation Pump 17 Ignition Electrode 18 Burner 19...

Page 9: ...ired temperature flashes on the screen DHW function is OFF Note The boiler does not produce DHW TEST Mode of adjustment by AUTHORISED SERVICE B P2 KEY OFF RESET The boiler is functionally switched off...

Page 10: ...anual reset is required S6 Burning initiated boiler is running S7 No burning WARNING CODE EXPLANATION SOLUTION E04 Low or high water pressure page 22 E01 No Flame page 22 E02 Limit thermostat page 22...

Page 11: ...done properly Please make the phase neutral and ground line connection as shown on the schema 3 2 OPENING THE BOX 1 Put the box on the floor as arrows showing down and open the box by cutting packing...

Page 12: ...e there is no air circulation Wall mounted boilers must be installed vertically on a strong wall that can carry it The unit must not be installed in connection with dirty and oily flue where the kitch...

Page 13: ...ter drain inside the house At least 75 mm siphon connection should be made when connecting ii Connection can be done to a water drain outside the house The condensation water discharge connection shou...

Page 14: ...e neck It should be clean Use the pipes in accordance with the applicable rules for the discharge of condensate water Since the condensation water pH is close to 2 acidity necessary precautions should...

Page 15: ...urve When there is an excessive pressure increase at heating system the security ventile operates in order to discharge the excessive water When radiator thermostatic valves are installed in the heati...

Page 16: ...connections and must be maximum 40 cm in sidelong connections Allowed maximum chimney length is 4 m If otherwise please consult the manufacturer for technical information Important There is an air pro...

Page 17: ...closing the purgers the other one can control the pressure by standing over the boiler and close the filling valve if needed In case of water shortage in closed circuit system after running of the boi...

Page 18: ...condensation reservoir of the boiler device can run by emiting smoke for a while Make sure that fuse switch which enables the energy connection of boiler is open If the boiler has waited for a long ti...

Page 19: ...E of THE CIRCULATION PUMP 3 speed circulation pump is used in MAKTEK Epsilon Eco Boiler It is possible to set the circulation with these three speeds according to resistance required by installation E...

Page 20: ...is shut down In OFF mode automatic protective functions below are in use DHW Freezing Protection Central System Freezing Protection Pump Squeezing Protection 3 Way Valve Squeezing Protection When manu...

Page 21: ...matically Provides constant temperature comfort with full modulation system DHW production is priority at the winter mode If it is required DHW can be moved to OFF position and only central system hea...

Page 22: ...eezing Protection Function Start DHW Min Flow DHW Max Pressure DHW Min Pressure Expansion Tank Capacity Expansion Tank Capacity Before Loading Maximum Working Pressure heating system Nominal Natural G...

Page 23: ...21 8 ELECTRICITY CONNECTION SCHEMA...

Page 24: ...all the authorised service 9 2 LOW HIGH WATER PRESSURE When the pressure in the system is below 0 7 bar or above 2 5 bar the boiler does not operate and E04 warning code appears on the LCD screen What...

Page 25: ...warning code appears on LCD screen Call authorized service 9 7 When a sensor failure occurs in heating system E05 warning code appears on the LCD screen Call authorized service 9 8 When there is an o...

Page 26: ...ent usage energy saving and protect quality at the beginning Maintenance must be done by only MAKTEK Autorised Service Intervention of private services except autorised services is extremely dangerous...

Page 27: ...that occur as a result of bad dirty fuel use the use of extremely calcerous water in hot water system ideal water hardness must be 15 20 French hardness 7 Start up and interventions by people other th...

Page 28: ...fire appropriate fire extinguisher must be used When Performing Maintainance or Repair When working on the heating system or the boiler itself there should be no current on these The main switch or f...

Page 29: ...om under the door Spaces under the doors can be filled with an elastic material filling Building doors shouldn t left open double door or automatic closing systems must be applied It is recommended to...

Page 30: ...inal ambalage Moving must be done with two people by holding from the corners of the boiler box Be sure that the box is completely closed while the moving and transporting Protect the boiler from mois...

Page 31: ...Seller 10013 Street No 14 A O S B i li IZMIR TURKEY Customer care sales maktek com tr Customer Hot Line 902323280365 www maktek com tr...

Reviews: