background image

P 8/ 8

Fig. 20

[2] Wiring in Housing

W

iring diagram

Brush holder complete

Put Light circuit in place

so that the  orange lead wire

faces toward the Terminal side.

[2] -1. Lead Wires of LED

Connector

Light circuit

lead wire holder

lead wire holder

LED

Be sure that the lead wires

of LED are tight here.

As illustrated below, fix the two lead wires (red and black) of LED

with lead wire holders, and route them between the pin and the boss.

pin

boss

Fit the corner of LED in this

corresponding corner of Housing (L).

LED

Connector (large)

Connector (small)

Light circuit

rib

Terminal side

Switch side

Do not cross the lead wires of LED here.

Lead wire

(orange)

pin

lead wire holder

With these lead wire holders,

fix the lead wires connected

to each connector.

20 degrees

[2] -2. Other Lead Wires

Assemble each Connecting

terminal to Switch at approx.

20 degrees to the vertical.

Switch

The lead wire (blue) from

Connector to Switch has to

be routed inside of this pin.

Put the following lead wires

between the rib and Light circuit.

*Lead wires (red and black) from

  Terminal to Connector (small)

*Lead wire (blue) from Switch

  to Connector (small)

Terminal

Summary of Contents for MAKSTAR BTW250 Series

Page 1: ...30 for BTW250 only Battery BL1830 for BTW251 only Fast charger DC18RA Charger DC24SA Charger DC24SC for BTW250 only Battery Specification Net weight kg lbs Capacity Ah Cell Voltage V 18 Driving shank...

Page 2: ...Large Disassembling Hammering mechanism Magnetizing screwdriver for removing Steel balls 1R346 Center attachment for 1R045 1R288 Screwdriver magnetizer Use for Fig 1 Anvil Surface that contacts Hammer...

Page 3: ...g box complete in 134848 9 Fit another 134848 9 over the hexagonal portion of Hammer case complete By turning 134848 9 clockwise with 1R223 and 1R224 the Hammer case section can be disassembled as ill...

Page 4: ...screwdriver magnetized using 1R288 Fig 7 9 Remove 1R045 by turning the handle counterclockwise 10 Remove Spindle Compression spring 25 and Cup washer 14 from Hammer as illustrated in Fig 8 Important...

Page 5: ...Bearing box complete side Fig 11 5 Assemble Hammer case complete to Bearing box as illustrated in Fig 12 Fig 12 ASSEMBLING Fig 11 Fig 10 Internal gear 51 Bearing box complete O ring 40 stepped end Fit...

Page 6: ...end of Armature If assembled wrong the Motor section cannot be assembled to Housing L Fig 14 2 Because Yoke unit is a strong magnet when assembling Armature to Yoke unit be sure to hold the commutator...

Page 7: ...s in Fig 19 are the Carbon brush section viewed from A Correct Wrong Lead wire of Carbon brush Lead wire correctly routed Torsion spring Tail of Torsion spring Tail of Torsion spring Circuit diagram C...

Page 8: ...in this corresponding corner of Housing L LED Connector large Connector small Light circuit rib Terminal side Switch side Do not cross the lead wires of LED here Lead wire orange pin lead wire holder...

Reviews: