background image

P 3 / 7

Fig.5

DISASSEMBLING

[4] Assembling Lock Off Lever and Switch Lever

[5] Disassembling/Asssembling Safety Cover and Bearing Box (Gear Section)

Fig.4

Fig.7

Fig.6

Compression spring 4

Compression spring 4

Switch lever

Switch lever

Lock off lever

Boss

Boss

Lock Off lever

Rib

Rib

Switch

1. Compression spring 4 for Lock off lever and Compression spring 4 for switch lever are the same. 
    Insert the bosses of Lock off lever and Switch lever into the compression springs 4 as illustrated in Fig.4.
2. Put their assembled parts into places as illustrated in Fig.5 so that the Compression springs 4 can perform well 
    between the bosses and the Ribs of Housing L. 

1. Remove Rubber ring 6 together with M6 countersunk head screw as illustrated in Fig.6.
2. Remove retaining ring S-34 with No.1R003 "Retaining pliers ST-2N". Safety cover can be separated from the machine
    as illustrated in Fig.7.
3. Remove Bearing box by unscrewing two M5x16 countersunk head screws as shown in Fig.8. If it is difficult to remove
    the Bearing box by hand, lever it up with 1R263 "Bearing extractor" as shown in Fig.9.

Housing L

Rubber ring 6

Safety cover

Safety cover

Retaining ring S-34

Countersunk
head screw M6

Fig. 8

Fig. 9

1R263 Bearing extractor

Bearing box

Countersunk head
screw M5x16

R

epair

Summary of Contents for Makstar BSS610

Page 1: ...for the tool shown above may differ from country to country BSS610 Cordless Circular Saw 165mm 6 1 2 W H1 H2 L TCT Saw blade 165mm 6 1 2 1 pc Hex wrench 5 1 pc Guide rule 1 pc Dust nozzle exclusively...

Page 2: ...Base complete Fig 2 Fig 3 1 Loosen M5x6 Hex socket head set screw for fixing Depth guide to Base complete See Fig 2 Loosen Lever 40 and remove Shoulder pin 6 7 for connecting Depth guide and Base comp...

Page 3: ...s as illustrated in Fig 5 so that the Compression springs 4 can perform well between the bosses and the Ribs of Housing L 1 Remove Rubber ring 6 together with M6 countersunk head screw as illustrated...

Page 4: ...29 from Bearing box Refer to Fig 12 4 Put Bearing box on 1R232 Pipe 30 and push the step of Spindle at its small end side using 1R026 Bearing setting pipe 16 8 2 and Arbor press to align the step of...

Page 5: ...re 8 Adjusting for accuracy of 90 and 45 cut Tapping screw CT4x12 Light cover Connector of power supply circuit Connector of LED circuit Fig 15 Pan head screw M5x40 Motor housing Blade case Flat washe...

Page 6: ...ircuit LED circuit Lead unit ON OFF switch Handle Section Motor Housing Blade Case Blade Case View from inner flange side Polyolefin tube LED Put polyolefin tube into the groove of connector box Conne...

Page 7: ...holders have to be expanded near these lead holders to avoid the lead wires contacts with M6x90 flat head square neck bolt The lead wires should not be pinched Bending the terminals of Micro switch a...

Reviews: