P 6/ 12
R
epair
[3] -3. Cam Complete, Change Lever
ASSEMBLING
DISASSEMBLING
(3) Mount the assembled Spindle section to the machine as drawn in
Fig. 6
.
Fig. 6
Fig. 7
1. Assemble the Spindle section to Cam holder complete.
2. Shift Change lever to Hammer drill mode.
Change lever
3. Hold Spindle and Change lever by hand, and put them
to housing (L) while turning them clockwise viewing
from Drill chuck side.
4. Shift Change lever to Drill mode.
And assemble Housing (R).
Cam holder complete
Spindle
Change
lever
Spindle section
Housing (L)
(1) Shift Change lever to Drill mode, and separate Housing (R) from Housing (L) by unscrewing seven 4x18 Tapping
screws. (See the
upper two
illustrations in
Fig. 3
.)
(2) Shift Change lever back to Hammer drill mode, and remove the Spindle section from Cam holder complete.
(See the
lower
illustrations in
Fig. 3
.)
(3) Disassemble Cam holder complete as drawn in
Fig. 7
.
Cam holder
complete
Cam holder
complete
Change lever
Steel ball 5
1. Remove Cam holder complete together with
Change lever from Armature.
2. Separate Change lever, Steel ball 5 and Plate 19
from Cam holder complete.
Plate 19
[3] DISASSEMBLY/ASSEMBLY
[3]-2. Helical Gear 39, Ball Bearing 6002LLB (cont.)