P 1
4
/ 2
2
R
epair
ASSEMBLING
Fig. 40A
Cushion ring 12
Ring 10A
O ring case A with
O ring 9 fit inside
Impact bolt A
(1) Assemble Impact bolt section to Tool holder (guide) complete as drawn in
Fig. 40A/ 40B
.
Note
: Be careful to the direction of each component.
Tool holder complete
HR2610: 140264-5
HR2611F: 140265-3
Impact bolt section in Tool holder complete for HR2610/ HR2610F
Sleeve 9A
Sleeve 9B
Washer 10
Compression
spring 20
O ring case B with
O ring 9 fit inside
Bit
installation
side
Inner housing
complete side
ø9mm
ø9.5mm
[3] DISASSEMBLY/ASSEMBLY
[3]-6. Impact bolt section in Tool holder complete for HR2610/ HR2610F
Tool holder guide complete for HR2610T/ HR2611FT (cont.)
Fig. 40B
Impact bolt B
Tool holder guide complete
Impact bolt section in Tool holder guide complete for HR2610T/ HR2611FT
Sleeve 9B
Bit
installation
side
Inner housing
complete side
long
short
ø9mm
Cushion ring 12
Ring 10B
O ring case A with
O ring 9 fit inside
Washer 10
Compression
spring 20
O ring case B with
O ring 9 fit inside