P 7 / 7
W
iring diagram
Hold the lead wires firmly with the lead wire holders.
Be sure to insert the lead wires till they reach the
bottom of each holder.
Caution: Be careful not to break the lead wires.
Make a loose portion of the lead wires here
by placing LED circuit as illustrated below.
Before Installation of Internal Electrical Parts
Fig. 17
After Installation of Internal Electrical Parts
Boss
Pin
Connector
LED circuit
Route the two lead wires (black and red) from LED circuit as illustrated below.
Connector
Terminal
Switch
Motor
End bell complete
Lead wire (red)
from Switch
Pin
rib
FET
Route the following lead wires as illustrated below;
Lead wires from End bell complete, Lead wires from Switch,
Lead wires from LED circuit
Hold the lead wires from Switch
and LED circuit securely with
these lead wire holders.
Place the lead wire (black) from
End bell complete above this rib.
Assemble Insulated
terminals to Switch
so that they do not
touch the boss.