4 - 2
('*(
3UH,QVWDOODWLRQ*XLGH
T
ABLE
4-1
PRE
-
INSTALLATION
CHECK
LIST
ACTION
Required
Not
Required
Date
Scheduled
Date
Complete
MACHINE REQUIREMENTS
Select machine site
"
Ensure proper foundation
1
"
Check floor space requirements
"
Check environment
2
"
Ensure power, air, and water
"
DELIVERY REQUIREMENTS
Provide clearance from truck to
machine location
"
Plan for off loading
"
Determine rigging requirements
"
Establish installation duties
"
MACHINING REQUIREMENTS
Determine fixturing needs
3
"
Identify job and workpieces
Identify inspection equipment
PERSONNEL REQUIREMENTS
Select Operator(s)
"
Select Programmer(s) and
Maintenance personnel
1. Special foundations or environmental arrangements (if required) have long lead times.
Proper does not necessarily mean a special foundation. Normal requirements are
described in
2. Environmental concerns related to machine location include temperature, humidity, and
cleanliness. See
3. Fixture design and manufacture typically require long lead times.
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...