3 - 2
('*(
3UH,QVWDOODWLRQ*XLGH
3.2
The Installation Process
Makino developed a thorough process to ensure a consistent and profes-
sional installation. This process is designed to provide the maximum ben-
efit from our FSE (Field Service Engineer) for set-up and alignment of the
machine and proper training of your operator(s). Your participation and
assistance are critical to an effective installation.
3.2.1
Customer Installation Duties
Makino asks that you be an active participant in the installation process.
Your duties are listed below.
Makino recommends that you:
•
Always use your unique RID (Request IDentification) number when
contacting us, to encourage clear, efficient communication (with your
sales order, Makino assigns a RID to track your machine installation).
•
Read the pre-installation information in this Guide.
•
and
. Use the worksheets
provided in
to prepare for delivery and installation of the
machining center.
•
Complete each task in the Pre-Installation Checklist (
expedite the installation and ensure adequate time for training. Proper
training during the installation provides the greatest return on your
investment.
-
Fax or mail your completed Pre-Installation Checklist to Makino.
This checklist is your request for installation services. The FSE
reviews the checklist to confirm completion of customer tasks, prior
to visiting your facility.
•
Consider having:
-
Maintenance personnel available to the FSE during installation; this
opportunity for exposure to the machine before the covers are on
should not be missed.
-
Operators and Maintenance personnel (ideally two, maximum of
four people) attend the Operation training.
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...