
01_20ed3a Safety.fm
1 - 15
3UH,QVWDOODWLRQ*XLGH
('*(
1.8
Electrical Maintenance Safety
Electrical maintenance procedures for Makino machining centers must be
performed by properly trained and technically qualified personnel. They
should adhere to these specific practices when working with the machin-
ing center:
•
Always perform Lockout/Tagout before working on electrical circuits.
See
•
Use extreme care when troubleshooting with power On.
•
With the power Off, identify and discharge any power retaining
devices, such as capacitors, before starting any maintenance proce-
dure within any electrical control cabinet.
Electrical Maintenance Equipment
Use only industry standard approved electrical testing equipment.
•
Volt/Ohm Meters.
•
Oscilloscopes.
•
Static Ground Wrist Straps.
Machine Grounding
All Makino machining centers must be properly grounded at the time of
installation.
•
JIS class 3 grounding (resistance of 100 Ohms or less) is recom-
mended.
•
Proper grounding requires an isolated earth ground.
•
Ground the machine in accordance with local, state, and federal regu-
lations.
Machine Electrical Devices
Always replace defective electrical components, such as fuses, shunts,
overloads, etc., with components of the same capacity and rating as the
original equipment. If you are unsure of the correct electrical component
or part, refer to the machine’s electrical drawings or consult Makino.
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...