14
same time with your left hand support the motor in position.
Pull out bolt. Then take out motor from the button of the
machine carefully.
10. Change a new motor one by one at counter step.
11. Recover the machine and make a test to insure the
machine can work normally.
12.Complete.
How to change the drying timer.
1. Disconnect power from machine.
2. Remove top panel assembly by removing two size
SD3.5x13mm screws.
3. Pull out timer knob from control panel.
4. Unscrew two screw size M4x6 from control panel.
Summary of Contents for MJ9200D
Page 1: ...1 MJ9200D TECHNICAL MANUAL ...
Page 2: ...2 ...
Page 5: ...5 ...
Page 7: ...7 ...
Page 9: ...9 ...
Page 11: ...11 ...
Page 16: ...16 Capacity C 80F Connection cx_c terminal of the wiring to terminals of capacity ...
Page 18: ...18 Fan Heat element Wire with fuse and Thermostat 2TT NC 125 85 ...