4
3.
ELECTRONICS UNIT
3.1.
First commissioning
When switching on the electronics unit for the first time, carry out the following programming.
Successive
menus
Possible settings
Navigation
Langues
FRANCAIS
•
Français
•
English
•
Deutsch
•
Español
•
Italiano
•
Nederlander
•
Portugués
For each parameter, select a data item with the
buttons, then confirm with the
OK
button.
Volume
50 m3
From 10 to 200 m
3
, in increments of 10.
Date
01/01/01
Day / Month / Year
Time
XX:XX
Hour / Minute
Display
In line
•
In line
•
Dashboard
3.2.
Keypad
COMMAND KEY
(depending on
model)
FUNCTION
MENU
•
Switching on the electronics unit.
→
A few minutes after switching on, production starts automatically (with or without ORP
check).
•
Switching off the electronics unit
(press and hold)
.
→
When switching off, the screen and the green LED turn off while the red LED comes on.
→
If an alarm has been activated, press first on to switch off.
•
Access the menus.
BOOST
Boost mode starts for 24 hours.
T°C
•
Water temperature display for a few seconds
(only if the default display is set to « In line
display »)
.
•
Direct access to the «
Parameters - Temp. Adjust
»
menu
(press and hold)
.
SALT
•
Salt level display for a few seconds
(only if the default display is set to « In line display »)
.
•
Direct access to the «
Parameters - Salt Adjust
»
menu
(press and hold)
.
pH
→
This command key is only present on the
DUO
and
PRO
models.
•
Direct access to the «
pH Regulation - Calibration
» menu
(press and hold)
.
Selecting a value or data element.
•
Cancellation of an entry
•
Back to previous menu.
•
Stopping Boost mode.
OK
•
Command confirmation.
•
Entering a menu.
•
Dismissing an alarm.