![Majestic Cadiz Installation Manual Download Page 13](http://html1.mh-extra.com/html/majestic/cadiz/cadiz_installation-manual_3764841013.webp)
Cadiz Installation Guide - Surface Profiles
– v2022
13
The Majestic Shower Company Limited
17 Flitch Industrial Estate, Chelmsford Road, Dunmow, CM6 1XJ
Tel44 (0) 8448 001 500
Fac44 (0) 1279 635 074 [email protected] www.majesticshowers.com
NOTE: Steps 19-20 require one person to support the door at all times whilst another person
Align the Door with the Return panel, checking that it is plumb vertical. Mark the
19
must be inside the enclosure with face plates, gaskets and screws.
To protect the glass when the door is being manoeuvred, fit the vertical seal to the edge of the
Return panel as shown. The seal is supplied over length and should be trimmed level with the
top of the panel.
Position the door mounting blocks in the underframe channel as shown and lift the door on to
the blocks.
20
screw holes for the hinges and then remove the Door and set aside.