background image

8

UVSRCA Vent-Free Fireboxes

20007435

Back Firebrick

T230

blower access

2/04

Blower Ac-

cess Cutout 

in Hearth 

Pan

Fig. 10

  Blower access.

NOTE:

 Hearth brick and/or hearth cover is removed 

as shown to gain access for blower and junction box 
installation.

T230

T231

junctin box cutout

2/04

Receptacle 

Outlet in 

Junction 

Box

Junction Box Cutout in 

Hearth Pan of Firebox

T231

Fig. 11

  Route powercord under the hearth pan and plug into 

the receptacle outlet.

Blower Installation

BEFORE YOU BEGIN...A FEW BASIC RULES

1.  Check to ensure that electrical service has been 

provided to the junction box located in the bottom 
chamber of the firebox.

2.  Check local building codes before installation of the 

firebox and the blower kit.

3.  All wiring must be installed and/or inspected as 

necessary to comply with the local authority having 
jurisdiction.

4.  The circuit breaker controlling the power supply to 

the 

pre-wired

 junction box in the appliance must be 

in the “OFF” position before beginning installation of 
the blower.

5.  The appliance, when installed, must be electrically 

grounded in accordance with local codes or - in the 
absence of local codes - with the National Electri-
cal Code, ANSI/NFPA 70 or the Canadian Electrical 
Code, CSA C22.1.

Read all the installation instructions for the appli-
cable appliance before beginning the installation of 
the blower.

UVSRC36A  Blower Installation

Step 1:

  Carefully unpack the blower assembly and 

familiarize yourself with the parts. Care should be taken 
not to damage the fan blades or housing.

Step 2:

  The SCVS - Variable Speed Control Kit (or 

standard wall switch) should be installed before the 
blower assembly installation. Please refer to instruc-
tions found in the SCVS Kit.

Step 3:

  Remove the bottom brick from the fireplace 

and carefully place it to the side to prevent damage.  
Use a flat blade screwdriver to gently lift up the front 
edge of the brick, then pull forward to remove.

Step 4:

  Locate the blower access cutout found at the 

rear of the hearth pan. Next, remove tape backing from 
tape on blower housing. Center the blower assembly in 
the access cutout area with the blower outlet duct point-
ing upward, then press firmly to attach foam tape to the 
back and bottom of the fireplace. (Fig. 10)

Step 5:

  Locate the junction box cutout found on the 

right side of the hearth pan. Route the powercord under 
the hearth pan and plug it into the receptacle outlet 
found in the junction box. (Fig. 11)

Step 6:

  Turn power back on and test blower operation.

Step 7:

  Replace the bottom brick in the fireplace.

UVSRC42A  Installation

Step 1:

  Carefully unpack the blower assembly and 

familiarize yourself with the parts. Care should be taken 
not to damage the fan blades or housing.

Step 2:

  The SCVS - Variable Speed Control Kit (or 

standard wall switch) should be installed before the 
blower assembly installation. Please refer to instruc-
tions found in the SCVS Kit.

Step 3:

  Remove the metal hearth cover and the bot-

tom two right brick panels from the fireplace and care-
fully place them to the side to prevent damage.

Step 4:

  Locate the blower access cutout found at the 

rear of the hearth pan. Next, remove tape backing from 
tape on blower housing. Center the blower assembly in 
the access cutout area with the blower outlet duct point-
ing upward, then press firmly to attach foam tape to the 
back and bottom of the fireplace. (Fig. 10)

Step 5:

  Locate the junction box cutout found on the 

right side of the hearth pan. Route the powercord under 
the hearth pan and plug it into the receptacle outlet 
found in the junction box. (Fig. 11)

Step 6:

  Turn power back on and test blower operation.

Step 7:

  Replace the metal hearth cover and the bottom 

two right panels in the fireplace.

Summary of Contents for FireStage UVSRC36A

Page 1: ...s having jurisdiction i e building inspectors re marshals etc should be consulted before installation to determine the need to obtain a permit When installing the Blower Kit it is necessary to bring t...

Page 2: ...lation 8 UVSRC36A Installation 8 UVSRC42A Installation 8 Install Optional Outside Air Kit 9 Replacement Parts 11 Accessories 12 Servicing 12 Warranty 15 Table of Contents UVSRC36A UVSRC42A Certi ed To...

Page 3: ...8 S 46 53 C G K I F Gas Line Access Rough Opening Height Rough Opening Depth O J 79006 ADCH39 45C SPECS 2 04 S S R Q Rough Opening Width C N 1 2 B D A Fireplace Dimensions Fig 1a UVSRC36A and UVSRC42A...

Page 4: ...n of 1 2 wallboard or plywood ush with the face of the replace Only the header Fig 1 may rest on the standoffs on top of the rebox When the replace is installed over carpeting vinyl tile or any combus...

Page 5: ...to achieve a raised hearth effect This can be done by adding a small platform to achieve the desired height NOTE See pre wiring of Junction Box and Electrical Services on Page 7 Step 2 Install the Fir...

Page 6: ...al lations The insulation and sealing of the enclosure around the replace is very important in cold climates If the en closure is insulated and sealed properly you can avoid future cold air problems T...

Page 7: ...the rebox opening where facing materials such as brick or stone are used on the face of the rebox It acts as a support restop It should be attached to the face of the replace with screws and sealed t...

Page 8: ...ck from the replace and carefully place it to the side to prevent damage Use a at blade screwdriver to gently lift up the front edge of the brick then pull forward to remove Step 4 Locate the blower a...

Page 9: ...to duct termina tion This will provide the least restriction to air ow No more than four 4 90 elbows can be used Duct run may be horizontal vertical inclined or any combina tion of these Fig 12 You ar...

Page 10: ...cap 7 6 00 djt Caulking Duct Ter mination Rain Cap Wall FP1061 Fig 15 Caulk and install duct termination rain cap in place Operating Precautions and Instructions Operation is automatic A slight negati...

Page 11: ...at any time without notice Description UVSRC36A UVSRC42A 1 Firescreen Rod 2 per replace 76397 76397 2 Firescreen w Rings 2 per replace 72301 72301 3 Screen Retainer 4 per replace 62222 62222 4 Back Br...

Page 12: ...sh contact CFM Corporation 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 Accessories Blower Kit BL 4 or FK12 Junction box is provided with replace Heat Reducing Canopy UC36 UVSRC36A UC42 UVSRC42...

Page 13: ...13 UVSRCA Vent Free Fireboxes 20007435...

Page 14: ...14 UVSRCA Vent Free Fireboxes 20007435...

Page 15: ...inspection the damage is found to be the fault of the manufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of...

Page 16: ...2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Reviews: