MP1800 Router Install Manual V1
.2
Step 7: Check whether the space between the installed devices and select
the appropriate baffle to place between the devices and use the screw to
fix the baffle on the shelf.
Caution
Installation suggestion:
When installing multiple kinds of devices on the same cabinet, install the
heavy one close to the bottom to reduce the cabinet center gravity and
improve stability.
To ensure the cooling space of the device when installing the device in the
cabinet, it is recommended to reserve the 1U height between the devices.
Install the configured baffle of the cabinet between the devices.
Install Device on Desk
MP1800 has the features of small volume and no noise. The user can place
the device on the office desk or other platform.
Caution
When MP1800 is installed on the office desk or platform, there should be
50cm space reserved around the device for ventilation and cooling. Do not
place sundries or other devices on the router.
Install Device on Wall
The installation steps are as follows:
Maipu Confidential & Proprietary Information
Page
41
of
55