CHECKOUT CONTROLLER

MV4k/1
MV4k/2

Summary of Contents for MV4k/1

Page 1: ...CHECKOUT CONTROLLER MV4k 1 MV4k 2...

Page 2: ...tents 2 Table of contents 2 General informatios 3 Pre instalation informations 4 Dimensions 5 6 Terms of use 7 Electrical parameters 8 Controller connections 9 10 Description of the panel 11 Controlle...

Page 3: ...ht interference The controller is fed in set controller photocell and a set of connectors to connect the cabling Basic parameters automatic control of main belt automatic control of additional belt ve...

Page 4: ...The lighting lamps of the station should be out of reach of the operator The controller as a machine component and the supply terminals of the controller are not adapted and are not used to connect t...

Page 5: ...S owackiego 12 tel fax 48 46 8752 777 www mains pl mains mains pl controller Mv4k 5 Mounting dimensions of controller Mounting dimensions of controller ventilation min 15 cm2 20 crevice min 20mm opti...

Page 6: ...MAINS S C E M Wosi scy Brzeziny 95 060 ul S owackiego 12 tel fax 48 46 8752 777 www mains pl mains mains pl controller Mv4k 6 Mounting photocells Mounting dimrnsions of photocells...

Page 7: ...50 60Hz with the protective ground Connecting only with the PE guard wire 220 240V 50Hz PE S START POWER SERVICE Mv4k Digital programmable belt controller OP ST CTRL OUT 2 Be careful with the water Th...

Page 8: ...Output current of the main belt max 2 A Output current of the additional belt max 2 A Max Power consumption of an additional circuit L1 100W Max Power consumption of an additional circuit L2 100W Pow...

Page 9: ...condenser phase cable of the motor power supply PE protective cable of the motor N neutral cable of the motor power supply 4 Power supply of the motor II X4 LM phase cable of the motor power supply CM...

Page 10: ...kets The individual cable cores should be insulated tinned or crimped with the use of the end sleeve as shown It is a protection against accidental short circuit of the cores and possible damage of th...

Page 11: ...rst pressing continuous signal second pressing intermittent signal 4 Safety switch disconnects the power supply terminal phase STOP in case of any emergency you must press the button This will immedia...

Page 12: ...n after removing the object from the photocell line of sight contact In case of shaded photocell or in case of lack of signal from it it is possible to move the conveyor using the footswitch If the co...

Page 13: ...ontinuously The second pressing causes the lamp to glow intermittently The third press turns off the lamp circuit Blinking function can be started programmatically and then switching is typical on off...

Page 14: ...ill be turn off too This is indicated by an intermittent tone and flashing of the SERVICE LED on the front cover One should then use the safety switch STOP 4 or turn the controller off the power with...

Page 15: ...the service mode 2 is possibility to switch off the pulse lamp mode by pressing the button 3 OUT diode starts flashing it means the lamp is in the constant mode By pressing second time the same butto...

Page 16: ...g time none of diode lights S START SERVICE CTRL OUT 2 Programming the opering modes MV4 Controller MV4K programing functions Service mode 3 and 4 Service mode 3 Service mode 3 is switched on while be...

Page 17: ...light ensure proper lighting conditions check whether the CTRL LED switches on after the unveiling the photocell if not call the customer service b The conveyor belt is not in a controlled footswitch...

Page 18: ...ring the transport the guarantor obligates himself to deliver fixed unit to the advertiser and is responsible for its loss during the transport 7 During the warranty period defective unit will be repa...