32
Kleiss MCS120-24 System Manual v.1.1 March 2021
|
www.MainlineControlSystems.com
9.0 Plugging Operation:
Take completion tool assembly and verify bottom
o-ring is in place.
Connect the completion plug onto the plug
spindle. The connection is good when the detent
balls of the plug spindle grip the completion plug.
You will hear a positive click.
Fully retract the plug into the dome.
Install the dome onto the ball valve and tighten the
dome by hand.
Make certain the plugging spindle is at the top of
the dome. Keep control of the spindle.
Verify drilling dome bleed valve is closed.