Maico MF-VK90-7 Mounting Instructions Download Page 7

8. Environmental conditions and operating limits │ UK 

 

8. Environmental conditions and 

operating limits 

Permissible air medium temperature max. 

+50 °C. 

 

9. Storage 

Store air distributor in a dry location  

(-20 to +50 °C). 

 

10. Mounting 

Mounting instructions 

●  Surface mounting on the wall/ceiling or in 

suspended ceilings is permissible. Any 

installation position. Alternatively, install-

lation in concrete or in the insulation layer 

under the screed. 

●  Take the bend radius of the flexible duct 

into account when selecting the installation 

location. 

●  Ensure access to an inspection opening. 

Cover [4] must be removable. 

●  Connection of folded spiral-seams duct to 

connection sockets [2] ‒ permissible 

connection diameter Ø 160 or Ø 125. 

●  Only fit air distributor in places with suffi-

cient load-bearing capacity. Sufficiently 

dimensioned mounting material is to be 

supplied by the customer. 

●  Ensure that foreign bodies cannot be 

sucked into the air distributor and ducts. 

●  Only operate the air distributor when it is 

completely installed. 

●  Close off non-used air distributor openings 

with the sealing plugs [5] supplied. 

 

NOTICE 

Leakage in the case of impermissible 

ventilation ducts. 

Only use permissible 

MAICO type MF-F flexible ducts. 

 

 

NOTICE 

Leakage in the case of tensely installed 

ventilation ducts. 

Ensure installation 

without any distortion. Insert ventilation 

ducts vertically until stop is reached in the 

air distributor. When inserting, listen for 

three clicks.

 

1.  Ensure a level base at the installation 

location.  

 

CAUTION 

Danger of injury in the case of insuf-

ficient mounting due to falling device. 

 Suitable mounting material is to be 

supplied by the customer. 

 

2.  Screw the air distributor to the wall, ceiling 

or a bracket with suitable mounting 

material. In a suspended ceiling, mount 

the air distributor with 3 or 4 fastening 

elements (e.g. threaded rods 

 Fig. A). 

3.  Vertically insert the duct branch's flexible 

ducts [6] until stop is reached in the air 

distributor's connection openings [3]. 

 

In the case of a bent flexible duct, 

install a mounting clamp near the 

distributor. Only bend the flexible 

duct after the mounting clamp. 

4.  Lay the flexible duct(s) in the mounting 

clamp(s) and fix it/them in place. 

5.  Close off non-used air distributor openings 

with the sealing plugs [5]. 

6.  Slide folded spiral-seams duct Ø 160 

directly over the housing sockets [2] and 

additionally seal them. For Ø 125 folded 

spiral-seams duct, use the optional plug 

connector [7] 

 Fig. F. 

 

11. Cleaning 

Cleaning interval: at least 1x yearly 

 

Inspection opening above or below 

depending on the installation situation. 

 

The cleaning of the air distributor and 

flexible ducts is done with the MAICO  

MF-R90 cleaning set, comprising a 

vacuum adaptor and pigs (cleaning 

balls).  

 

12. Environmentally responsible 

disposal 

Once they have reached the end of their 

useful lives, dispose of units in an environ-

mentally-sound manner in accordance with 

local requirements. 

Summary of Contents for MF-VK90-7

Page 1: ...Montageanleitung Luftverteiler Mounting instructions Air distributor Notice de montage Diffuseur d air MF VK90 7 www m aico ventilatoren c om DE UK FR...

Page 2: ...B A 3x 4x...

Page 3: ...F C E 160 125 D...

Page 4: ...inder 7 DN 160 direkt am EPP Geh usestutzen 3 Anschluss Flexrohr DN 90 4 Deckel Revisions ffnung 2 St ck 5 Verschlussstopfen 5 St ck 6 Flexrohr MF F DN 90 optional 7 Steckverbinder SVR 125 optional T...

Page 5: ...ag in den Luftverteiler einstecken Beim Einstecken auf ein drei maliges Einrastger usch 3x Klick achten 1 Am Montageort f r einen ebenen Unter grund sorgen VORSICHT Verletzungsgefahr bei unzureichende...

Page 6: ...pieces 5 Sealing plugs 5 pieces 6 MF F 90 flexible duct optional 7 SVR 125 plug connector optional T Rating plate Fig D Space saving installation Fig E Installation example flexible duct positions Fi...

Page 7: ...ically until stop is reached in the air distributor When inserting listen for three clicks 1 Ensure a level base at the installation location CAUTION Danger of injury in the case of insuf ficient moun...

Page 8: ...tubulure du bo tier EPP 3 Raccord de la gaine flexible 90 4 Couvercle de l ouverture de visite 2 pi ces 5 Bouchons de fermeture 5 pi ces 6 Gaine flexible MF F 90 en option 7 Raccord enfichable SVR 12...

Page 9: ...te en cas d utilisation de gaines d air non admissibles Utiliser uniquement des gaines flexibles MAICO de type MF F admissibles ATTENTION Fuite en cas de gaines d air soumises traction Veiller viter t...

Page 10: ...e MF R90 de MAICO constitu d un adaptateur d aspira teur et de racleurs boules de nettoyage 12 limination respectueuse de l environnement liminer les appareils hors d usage dans le respect de l enviro...

Reviews: