![Mahindra 4010 HST Operator'S Manual Download Page 23](http://html1.mh-extra.com/html/mahindra/4010-hst/4010-hst_operators-manual_695043023.webp)
Safety Starter Switch is to be replaced after every 2000 hours/4 years,
whichever is earlier
TRACTOR RUNAWAY
1. The tractor can start even if the transmission is engaged position causing Tractor to runaway
and serious injury to the people standing nearby the tractor.
2. For additional safety keep the pull to stop knob (fuel shut off control) in fully pulled out position.
Transmission in neutral position, Foot brake engaged and PTO lever in disengaged position
while attending to Safety Starter Switch or any other work on Tractor.
SAFETY STARTER SWITCH
1. Master brake pedal operated safety switch is provided on HST Tractors which allow the starting
system to become operational only when the master brake pedal is fully pressed.
2. Do not By-pass this safety starter switch or work on it. Only Authorized Dealers are
recommended to work on safety starter switch.
3. On some models Safety Starter switch is provided on transmission High-low shifter lever and in
PTO shifter lever. The tractor can be started only if High-low shifter lever is in neutral position.
WORK IN VENTILATED AREA
Do not start the Tractor in an enclosed building unless the doors &
windows are open for proper ventilation, as tractor fumes can cause
sickness or death. If it is necessary to run an engine in an enclosed area
remove the exhaust fumes by connecting exhaust pipe extension.
Caution
21
Summary of Contents for 4010 HST
Page 2: ... Mahindra USA Inc 5203 Aeropark Drive Houston TX 77032 281 449 7771 www mahindrausa com ...
Page 33: ...DECALS ON THE CHASSIS 31 ...
Page 34: ...32 DECALS AROUND THE SEAT ...
Page 49: ... OPERATING THE 3 POINT LINKAGE TPL 47 ...
Page 89: ... POWER TRAIN 87 38PS ...
Page 91: ...DATE TRACTOR HOURS NATURE TYPE OF REPAIR SERVICE CARRIED OUT SERVICE RECORD 89 ...
Page 93: ...PART REPLACEMENT RECORD DATE PART DESCRIPTION Q TY COST DATE PART DESCRIPTION Q TY COST 91 ...
Page 103: ......
Page 105: ......
Page 106: ...1 SAFETY PRECATIONS PRECAUTIONS BEFORE OPERATION 1 2 1 ...
Page 112: ...2 EXTERIOR VIEW 2 2 SERVICING 2 3 PRECAUTIONS BEFORE OPERATION 2 ...
Page 115: ......
Page 121: ......
Page 122: ...4 DAILY CHECKS 4 2 BREAK IN 4 2 PERIODIC CHECKS 4 3 BREAK IN AND CHECKS 4 ...
Page 125: ......
Page 141: ......
Page 149: ......
Page 150: ...7 SPECIFICATIONS 7 2 SPECIFICATIONS 7 ...
Page 155: ......
Page 156: ...8 INDEX 8 2 INDEX 8 ...
Page 159: ......