5
-11
MAINTENANCE
The coolant mixture should
not exceed 50% anti-freeze by
volume.
Freezing temperatures can quick-
ly and severely damage the engine
if the cooling system is unprotected.
Use antifreeze when temperatures
fall below 32
o
F (0
o
C).
1. Only use permanent anti-freeze in
this engine.
2. Completely drain and flush the
cooling system with clean water
before adding anti-freeze.
3. Mix the proper amounts of an-
ti-freeze and pure water in accor-
dance with SAE J1034 and SAE
J814C based on the expected am-
bient temperature.
4. Mix the anti-freeze and water be-
fore pouring it in the cooling sys-
tem.
This data is the industry stan-
dard for a typical ethylene glycol
based antifreeze. These volumes
of anti-freeze, when mixed with
pure water, will reduce the freez-
ing point of the coolant mixture
as shown.
When adding coolant during dai-
ly service, use only water or an-
ti-freeze mixed with water to en-
sure that the mix ratio stays at or
below 50% anti-freeze.
Keep unused anti-freeze in a
clean, tightly sealed container.
Do not use radiator cleaning
agents when anti-freeze has
been added to the cooling water.
(Anti-freeze contains an anti-cor-
rosive agent, which will react with
the radiator cleaning agent form-
ing sludge which will affect the
engine parts.)
Anti-
freeze
Vol%)
Freezing Point
Boiling Point
o
C
o
F
o
C
o
F
40
50
-24
-37
-12
-34
106
108
222
226
*At 760 mmHg pressure (atmospher-
ic), a higher boiling point is obtained
by using a radiator pressure cap
which permits the development of
pressure within the cooling system.
ANTI-FREEZE
NOTE
IMPORTANT
Summary of Contents for 4010 HST
Page 2: ... Mahindra USA Inc 5203 Aeropark Drive Houston TX 77032 281 449 7771 www mahindrausa com ...
Page 33: ...DECALS ON THE CHASSIS 31 ...
Page 34: ...32 DECALS AROUND THE SEAT ...
Page 49: ... OPERATING THE 3 POINT LINKAGE TPL 47 ...
Page 89: ... POWER TRAIN 87 38PS ...
Page 91: ...DATE TRACTOR HOURS NATURE TYPE OF REPAIR SERVICE CARRIED OUT SERVICE RECORD 89 ...
Page 93: ...PART REPLACEMENT RECORD DATE PART DESCRIPTION Q TY COST DATE PART DESCRIPTION Q TY COST 91 ...
Page 103: ......
Page 105: ......
Page 106: ...1 SAFETY PRECATIONS PRECAUTIONS BEFORE OPERATION 1 2 1 ...
Page 112: ...2 EXTERIOR VIEW 2 2 SERVICING 2 3 PRECAUTIONS BEFORE OPERATION 2 ...
Page 115: ......
Page 121: ......
Page 122: ...4 DAILY CHECKS 4 2 BREAK IN 4 2 PERIODIC CHECKS 4 3 BREAK IN AND CHECKS 4 ...
Page 125: ......
Page 141: ......
Page 149: ......
Page 150: ...7 SPECIFICATIONS 7 2 SPECIFICATIONS 7 ...
Page 155: ......
Page 156: ...8 INDEX 8 2 INDEX 8 ...
Page 159: ......