6
and attach to the valve.
Make sure that all fittings are checked for cracks and leaks.
Attach the millivolt wiring as shown in the gas log instruction sheet.
Check the gas pressure as shown in the gas log instruction sheet.
Pour the sand or vermiculite in the pan and place the logs as shown. Do not test fire the system until
all fittings are checked for leaks.
Run the gas log for 30 minutes or more to make sure that all operations are working properly.
Go over the operation instructions with the customer to assure that they understand the system.
Fig. 6
Front of unit
SP-40-ZC Gas Log Assembly
Gas log placement