1.0
Mechanical Installation
This section provides detailed procedures for properly
installing the Electronic Modulevel Displacer Level
Transmitter.
1.1
Unpacking
Unpack the instrument carefully. Take care not to bend the
displacer stem or enclosing tube. Ensure all components
have been removed from the packing material. Check all
the contents against the packing slip and report any dis-
crepancies to the factory.
Before proceeding with the installation, do the following:
•
Inspect all components for damage. Report any damage to
the carrier within 24 hours.
•
On chambered units, remove the shipping strap and wire
assembly holding the displacer in place. This assembly
must be removed through the bottom chamber connection
before start-up.
Caution:
If reshipping to another location, the displacer
must again be secured using the same strap and
wire assembly.
•
Check that the model number on the nameplate matches
the packing slip and purchase order.
•
Record the model and serial numbers for future reference
when ordering parts.
Model Number
Serial Number
1.2
Electrostatic Discharge (ESD)
Handling Procedure
Magnetrol’s electronic instruments are manufactured to the
highest quality standards. These instruments use electronic
components which may be damaged by static electricity
present in most work environments.
The following steps are recommended to reduce the risk of
component failure due to electrostatic discharge.
•
Ship and store circuit boards in anti-static bags. If an anti-
static bag is not available, wrap the board in aluminum
foil. Do not place boards on foam packing materials.
•
Use a grounding wrist strap when installing and removing
circuit boards. A grounded workstation is recommended.
1
48-618 ES/EZ Modulevel Displacer Level Transmitter (Top Hat Assembly Design)