5
Figure 1
Figure 2
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Tools Required
Gather the necessary tools and parts before starting the installation� Carefully follow the instructions with the
tools and parts required for installation�
•
Tape Measure
•
Flat-Head Screwdriver
•
Phillips Screwdriver
•
Level
•
Cordless Electric Drill
•
Hammer
•
Wrench or Pliers
•
Pipe Wrench
•
10” Adjustable Wrenches (2)
•
3/8
"
Nut Driver
•
1/4
"
Nut Driver
•
1/8
"
(3�2mm) drill bit (wood floors)
•
Marker or Pencil
•
Masking Tape
•
Pipe-Joint Compound resistant to LP/NG
•
3/16” Carbide-Tipped Masonry Drill Bit (Concrete/Ceramic
Floors)
•
Non-Corrosive Leak-Detection Solution
Parts Supplied
Check that all parts are included�
16 x 1-5/8”
Screws (2)
Anti-Tip
Bracket
Gas Pipe Adapter
with Washer
Regulator
Flexible Gas Supply Line
Adapter
Gas Supply Line Kit
Adapter
LP/Natural Gas
Conversion Kit
Parts Needed
Check local codes and consult gas supplier�
Depending on the thickness of flooring, longer screws may be required to anchor the anti-tip bracket to the sub
floor� Longer screws should be available at your local hardware store�
The anti-tip bracket must be securely mounted to the floor�
Summary of Contents for MCSBRG24W
Page 22: ...22 PRECAUCIONES planation ADVERTENCIA Peligro de volcamiento...
Page 23: ...23...