53
English
After selecting a point from the prompted list (see fig-
ures below), the unit will set the
Site ID
and
Site
Description
fields accordingly.
•
Time on Site (sec)
: Occupation time on known point
(default: 15 seconds).
Initialization Phase
7. Tap the
Log
button at the bottom of the screen.
A screen is displayed showing the counting-down of the
initialization phase (see screen opposite). The
Remain
field
will count down beginning from the value of the
Time on
site
field set on the
Survey Settings
screen. At the end of
the countdown sequence, the
Remain
field is replaced with
the
Elapsed
field which reads “00:00:00”.
Data Collection
8. Walk to the start point of the trajectory you want to survey.
Be careful not to mask the antenna as this might cause
loss of satellite signals.
Initialization count-down.