background image

 

                                          

MAGA s.r.o., S. Kollára 86, Čerenčany  979 01, Slovak  Republic.

 

                                               +421 917 465 298, [email protected],www.magasro.sk           

Made in Slovakia

 

 

 

1 BOILER USE AND ADVANTAGES 

Hot  water  boiler  MAGA  DP25  Premium  is  designed  for  heating  of  dwellings, 

houses,  cottages  and  other  objects  demands  on  the  heat  source  (heating  +  hot  water 

system)  shall  not  exceed  20  kW.  The  recommended  fuel  is  wood  pellets  of  a  diameter  of 

6-8  mm,  which  are  transported  by  the  feeder  from  the  autonomous  container  into  the 

combustion  chamber.  This  allows  time-saving  and  user  friendly  operation  and 

maintanance.  The  high  efficiency  can  be  achieved  by  low  operating  costs.  Moreover, 

automatic  ignition  of  fuel  in  the  focus  guarantees  very  low  emission  burden  on  the 

surrounding  environment  (in  the  boiler  properly  set  it  is  practically  a  "smokeless" 

incineration).  Regulator  is  adapted  for  connection  to  external  control  (room  thermostat, 

equithermic  regulation),  including  control  of the circulating  pump.

 

MAGA  DP  25  solid  fuel  boilers  are  designed  for  combustion  of  wood,  wood 

briquettes  in  manual  application,  or  burning  of  6 mm  diameter  wood  pellets  in 

automatic  mode.  Nominal  output  for  DP  25  steel  boilers  is  20  kW  for  manual  loading  of 

wood  and  3-20  kW  for  automatic  pellet  operation.  The  boiler  body  is  equipped  with  a 

dual  heat  exchanger  (vertical  tubular  and  horizontal  vane)  which  ensures  optimal  heat 

transfer  to  the  system.  High  quality  insulating  materials  minimize  heat  losses  and 

contribute  significantly  to the  high  thermal  efficiency  of  the entire  facility  94.5 %. 

The  boilers  are  fitted  with  a  built-in  cooling  loop  and  can  be  used  in  both  forced 

and  self-draining  systems.  Very  good  price  and  short  delivery  times!  Of  course,  the 

products  we  supply  are  trouble-free  and  economical  operation,  low  operating  costs  and 

reliability.  All  of  our  energy-efficient  systems  are  innovative  and  environmentally 

friendly.

 

 

 

 

 

 

Summary of Contents for DP25 PREMIUM

Page 1: ...RATION OF MAGA PELLET AND WOOD BOILER DP25 PREMIUM Fig 1 MAGA DP25 PREMIUM Dear customer thank you for the purchasing of our product Please follow the manual in order to be 100 satisfied with its oper...

Page 2: ...ATIONS 13 5 2 BOILER PLACEMENT 14 6 STARTUP INSTRUCTIONS FOR CONTRACTUAL SERVICE ORGANIZATION 18 6 1 BEFORE START CHECK 18 6 2 FIRST BOILER OPERATION AND OPERATOR TRAINING 19 6 3 BOILER OPERATION 20 7...

Page 3: ...for connection to external control room thermostat equithermic regulation including control of the circulating pump MAGA DP 25 solid fuel boilers are designed for combustion of wood wood briquettes in...

Page 4: ...e remote room control EcoSTER 200 boiler operation without the need for physical presence in the boiler room 3 Water accumulation tank buffer of min volume 800 litres Please make sure your boiler set...

Page 5: ...nburned fuel residues fall through into the ash collector at the bottom of the chamber Automatically operated pellet burner controls the air intake fuel intensity of burning ignition and extinction ac...

Page 6: ...163 F mm 1220 G mm 1145 H mm 285 Power nominal pellet kW 17 or 27 Max Power pellet kW 20 27 Upper fuel chamber capacity l 65 Operational chimney flow Pa 15 20 Max Operational water pressure MPa 0 2 Bo...

Page 7: ...arts need to be connected in the numeric order according the figure 7 Parts with the same numbers need to be completed at on time 6 6 9 9 Put the cover on the top after feeding the silo with pellets P...

Page 8: ...8 Fig 3 Assembly of pellet feeder 1 oven tray 2 nut 3 screw 4 spring 5 bolt 6 screw 7 rod 8 screw 9 Gearbox with engine motor For proper operation of the feeder must be inserted through the opening to...

Page 9: ...llet burner need to be pushed into the boiler door and fitted by enclosed screws To the top of the burner need to be connected with the tube of the feeder This have to be done with all the types of bu...

Page 10: ...l feeder and ventilator parameters for the setback mode Operation of feeder and fan hand The flow temperature of the circulating pump Central heating The storage tank Control pumps for hot The control...

Page 11: ...ondition and an interruption of the fuel supply to the burner Photosensor The photosensors monitors the flame intensity in the combustion chamber In the event of a decrease in light intensity the burn...

Page 12: ...7 465 298 servis magasro sk www magasro sk Made in Slovakia 12 STB fuse protects a controller against high voltage and short curcuit It consists of a tubular glass fuse STB 3 15 A which after melting...

Page 13: ...m STN 06 0310 central heating designing and assembly STN 06 0830 Safety set up for central heating and hot water STN 07 7401 Water and steam for thermal energy facilities with a working pressure up to...

Page 14: ...ler is located in the cellar we recommend placing it on concrete slabs min 50 mm high The boiler must stand horizontally Safety distance from combustible materials When installing and operating the bo...

Page 15: ...ler is connected to power Fixed network attached corded completed a standardized plug Protection against electric shock must be ensured in accordance with the applicable EN STN see Sec 1 4 Location of...

Page 16: ...MAGA s r o S Koll ra 86 eren any 979 01 Slovak Republic 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 16 Fig 10 Boiler placement in the boiler room space...

Page 17: ...supply terminated by a standardized fork Protection against electric shock has to be ensured according to current STN EN see chapter 4 1 Fuel location For proper combustion in the boiler it is necess...

Page 18: ...of the exchanger Precipitation of 1 mm calcite reduces at a given place the heat transfer from the metal to water by 10 Heating systems with an open expansion tank allow direct contact of heating wat...

Page 19: ...ug into an electrical socket leave it running for approx 10 minutes if the conveyor is not filled and the pellets do not start to fall over the hose 5 Perform calibration of the fuel feeder and set pa...

Page 20: ...in operation is not permitted If there is a danger of penetration of combustible vapors or gases into the boiler room or at works where there is a risk of fire or explosion gluing the floorings paint...

Page 21: ...em it is only added to the cooled boiler to avoid damaging the steel heat exchanger Check the boiler before starting up the boiler A The tightness of the heating system B Connection to the chimney mus...

Page 22: ...he weight of the burned pellets when the boiler control is set correctly when the combustion process is optimal For less efficient combustion the amount of ash produced increases proportionally Follow...

Page 23: ...lean the heat exchanger tubes using a rounded poke and brush 4 After cleaning insert the turbulators back put on the steel cover and then install the top cover Ashtray Spill out the ash regularly Ash...

Page 24: ...s For this purpose it is necessary to remove the cover by loosening in models of four screws Then remove the photosensor from the socket clean and reassemble After performing the above operations the...

Page 25: ...ion tube of the burner from the crush and ash at the beginning of each day and then once in a while After removing the burner remove the ash and debris residue with the best wire brush or small knife...

Page 26: ...er and burner temperature sensors Checking and cleaning the flame sensor Check flap state with counterbalance if any Recording the status of service counters Cleaning the jet nozzles and the burner bu...

Page 27: ...st be responsible The first initial start and installation of the burner must be performed by an authorized service technician The service technician will fill in the Letter of Guarantee within this M...

Page 28: ...CE LIFE Please kindly take into account that the productis made of conventional metallic materials therefore it is recommended to disposeits individual parts as follows Boiler body cladding recycling...

Page 29: ...ammable liquids Possible flame observation during boiler operation is by opening the door Opening the door during operation is prohibited When operating the boiler it is necessary to have a carefully...

Page 30: ...security efficiency we draw attention to the possible emergence of certain residual risks that can not be eliminated by any technical solution Electrical risks The connection maintenance of the repai...

Page 31: ...combusted in the boiler I forbid storage of flammable liquids near the boiler Take full attention to the risk of burning when operating the boiler Risks due to fuel handling When handling from fuel pa...

Page 32: ...sidues Therefore the extinguishing process must be carried out before turning off the power supply of the burner In case of more serious faults contact the installer The burner does not ignite the fue...

Page 33: ...ting of the internal feeder towards the outside Increase the time of the internal feeder service menu burner feeder Transmission Damage Transmission Replacement Incorrectly selected service interval v...

Page 34: ...is magasro sk www magasro sk Made in Slovakia 34 13 WARRANTY AND GUARANTEE Warranty and after warranty reparations are made by Manufacturer MAGA s r o S Koll ra 86 979 01 eren any Slovak Republic Tel...

Page 35: ...303 5 2012 Product Serial number Production date Stamp and signature of the producer Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarant...

Page 36: ...or supplier as well as defects caused by the accidental or intentional penetration of liquid insects animals or foreign objects into the product s body 4 Should a component fail this component will be...

Page 37: ...y with the instructions for use improperly executed assembly resulting in malfunctioning of the product or reduced performance are covered by the end user of the product Rights of Product Liability fo...

Page 38: ...c 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 38 RECORD OF GUARANTEE REPAIRS Record of performed repairs within and after guarantee period Date of the record Performed activity O...

Reviews: