MAINTENANCE WORK
COOLING SYSTEM
Maintenance manual T225/T230
57
Adding coolant
Add coolant only when the motor is at standstill.
X
Unscrew the drain hose from the drain valve.
X
Screw the protection cap onto the drain valve.
Fig. 28: Heater / Ventilation
1
Temperature rotary switch
2
“Air conditioner” on/off switch – optional
3
Blower switch (4-stage)
X
Check that the heater's regulator is set to maximum heat
output (only for MT without air conditioning unit).
The ventilation of the heating system is thereby ensured
during the filling.
X
Slowly fill coolant through the opening of the equalising
reservoir until the fill level lies between the “MIN” and “MAX”
markings.
Make sure that no air bubbles develop and that the air in the
system can escape through the opening.
X
Start the motor.
Run the motor at low speed.
3
The cooling system is vented.
X
Turn the motor off when no more air bubbles rise to the
surface.
X
Check the coolant level once more, add more coolant if
necessary and start motor again.
X
Close the cooling system with the cap at the expander tank.
The system needs to be filled completely.
11-C26-067-033A-2
Summary of Contents for Trac T225
Page 1: ...Maintenance manual MAFI Trac T225 T230 Terminal Trac get it rolling Production no 326xxxx ...
Page 8: ...6 Maintenance manual T225 T230 ...
Page 28: ...SAFETY WARNING SIGNS ON THE MAFI TRAC 26 Maintenance manual T225 T230 ...
Page 34: ...32 Maintenance manual T225 T230 ...
Page 112: ...OPERATING MATERIALS FILLING QUANTITIES 110 Maintenance manual T225 T230 ...
Page 113: ...Maintenance manual T225 T230 111 ENVIRONMENTAL NOTES Disposing of operating materials ...
Page 118: ...ENVIRONMENTAL NOTES DISPOSING OF OPERATING MATERIALS 116 Maintenance manual T225 T230 ...