![MacroAir Technologies Controller 30 Operation Manual Download Page 13](http://html1.mh-extra.com/html/macroair-technologies/controller-30/controller-30_operation-manual_687332013.webp)
11
Network Installation
© 2020 MacroAir Technologies Toll Free: 866 668 3247 Fax: 909 890 2313 www.macroairfans.com
Controller 30 Operation Manual 90-30016-00 Rev A-01 Date: 031920
Controller Wiring Instructions
⚠
WARNING:
Power to be off.
Prior to following the steps below, ensure all power to the
touchscreen is off.
1.
Run the included power supply cable through the gland on the bottom of the network
controller and plug the terminal block in per the below diagram.
2.
3.
Run one end of CAT5e through the gland on the bottom of the network controller and wire
the blue and blue/white wires to the touchscreen per the diagram below. Do not remove
any factory wiring.
4.
5.
If a fire alarm is being used, a normally closed relay can be tied into the orange and orange/
white wire coming from the fans. If a fire alarm is not being used, the orange pair needs to
be twisted together.
6.
If you are utilizing the optional remote operation feature (pg 28), run a separate CAT5e from
your router to the LAN A port on the back of the screen. The CAT5e will need an RJ45 male
end terminated per the pinout below.
Touchscreen Wiring Diagram
•
For AVD 370 fans with RJ45 ports refer to page (pg 12).
•
•
For all other fans (AVD3, 550, 780, Y and X Series Fans) refer to page (pg 16).
•