6
CHAPTER2
INSTALLATION
2.1
Install Machinery
Take Out the Machine,can not pull the optical axis inside the machine, otherwise it will cause deformation of the optical axis.
2.2
Install the Material Shelf
Step 1:
Use the M3 screw, which attached in the accessory box
Step 2:
Plugged in.
Step 3:
Turn on the power switch.
2.3
Dismantle the Model
1.
Click “Application” on display panel, Enter the “Manual” control, Choose “Z” (which means Heating bed move up and Down ), click
on the
to let hot bed fell to a suitable height.
2.
Click BACK to return, then click on the hot bed pattern to BED PREHEAT interface, input 80 and turn “on”
hotbed temperature
is automatically heated to 80°C.
3.
About 2 minutes heating, Gently off the model with the scraper knife.