background image

Auckland (Head Office)

 

20 Carr Rd, Three Kings
Auckland 1041

P:

 09 624 1115

F:

 09 624 1110

E: 

[email protected]

Wellington

P:

 04 569 8033  

F:

 04 569 8066

Christchurch

P: 

03 348 2356  

F: 

03 348 2376

www.macdonaldindustries.co.nz

02/20

INSTALLATION - SURFACE MOUNT

Recommended Blocking:

If the walls do not have studs on center, then 
additional blocking is necessary 

(Fig. d)

.

Contact an architect or building contractor 
to make sure the blocking is adequate and 
complies with building codes.

NOTE:

- Changer MUST be mounted to studs 

(Fig. e)

.

-  This unit incorporates a finishing collar that 

seats behind the changer’s outside flange. 
Center the collar as the unit is being tightened 
against the wall 

(Fig. f)

.

813mm on centre

Fig. d

Top

Surface-Mount Holes

Collar

Unit

Wall

Fig. f

356 on centr

e

Fo

r disabled compliance 1220m

m

A.F.F

Fig. e

813mm on centre

Fig. d

Top

Surface-Mount Holes

Collar

Unit

Wall

Fig. f

356 on centr

e

Fo

r disabled compliance 1220m

m

A.F.F

Fig. e

813mm on centre

Fig. d

Top

Surface-Mount Holes

Collar

Unit

Wall

Fig. f

356 on centr

e

Fo

r disabled compliance 1220m

m

A.F.F

Fig. e

Reviews: