
Introduction
This document explains where to install the different steel fingers in the correct locations for FD230 and FD235 headers. A
list of parts included in each kit is provided in Chapter
.
Installation time
Installation time for this kit is approximately 3 hours.
Conventions
The following conventions are used in this document:
•
Right and left are determined from the operator
’
s position. The front of the header is the side that faces the crop; the
back of the header is the side that connects to the combine.
•
Unless otherwise noted, use the standard torque values provided in the header operator
’
s manual and technical
manual.
NOTE:
This document is currently available in English only.
215505
i
Revision A