![background image](http://html1.mh-extra.com/html/macdon/912/912_operators-manual_3200212080.webp)
Form # 46620
Issue 01/06
78
UNLOADING & ASSEMBLY
INSTALLATION:
8. Install electrical harness (continued):
•
Mount harness relay block onto front shield for
cylinder control valve. Use two #8 x ¾ inch truss
head screws and lock nuts.
•
Plug the two relays into harness block.
•
Attach kit harness ground wire to shield mounting
bolt at (J).
IMPORTANT:
Scrape paint off of both
sides of bracket and off frame in area surrounding
mounting bolt. Ground terminal, bracket and frame
must have metal-to-metal contact to ensure proper
ground.
•
Route kit harness (as shown in bottom photo)
between cylinder control valve and header control
valve (located towards front/center of tractor).
Leave harness unsecured until connections are
made.
•
Detach existing wire (K)
443 green
from top solenoid (
S2
) of cylinder control valve.
•
Detach existing wire (L)
444 green
bottom solenoid (
S3
) of cylinder control valve.
•
At header control valve, detach wire (M)
414 green
from solenoid.
•
Connect kit harness wire (N) marked
443
to top solenoid (
S2
) and connect tractor harness wire (K)
443
(removed above) to kit harness as shown.
•
Connect kit harness wire (P) marked
444
to bottom solenoid (
S3
) and connect tractor harness wire (L)
444
(removed above) to kit
harness as shown.
•
Connect kit harness wire
(Q) marked
414
to header
control valve solenoid and
connect tractor harness
wire (M)
414
(removed
above) to kit harness.
•
Use plastic ties provided to
secure kit harness to
existing hoses/harnesses
to prevent contact with
moving parts.
J
MOUNT HARNESS BLOCK ON SHIELD &
ATTACH GROUND WIRE
K
L
DETACH EXISTING WIRES 443 & 444 FROM
S2 & S3 AT CYLINDER CONTROL VALVE
DETACH EXISTING WIRE 414 FROM
SOLENOID AT HEADER CONTROL VALVE
M
N
K
P
L
M
Q
MAKE HARNESS CONNECTIONS AND SECURE ROUTING
Summary of Contents for 912
Page 2: ......