15
3) Attach the line on a fixed point.
6) Separate the right panels apart from
the left panels.
2) Move packing loops to get them
closer.
5) When you put the main rescue lines
under tension, the 4 corner lines are
loose.
SALVAGE SQ 160, - PREPARATION FOR PACKING
1) String the packing loops on a line.
4) Separate the lines of the two halves
of the canopy on each side of the
centre thicker white lines.