![MAC PARA Salvage SQ 110 Operating Instructions Manual Download Page 13](http://html1.mh-extra.com/html/mac-para/salvage-sq-110/salvage-sq-110_operating-instructions-manual_3172252013.webp)
13
08. PACKING INTERVALL
Ideally our parachute should be repacked every 6 months, preferably by a qualified
professional to ensure best operation. Maximal interval is 12 months. It makes sense when
you throw the rescue package for training on this occasion in a clean, dry space.
Before the rescue is repacked it must be subjected to a visual inspection by the packer.
The reserve parachute must therefore be aired at a humidity of 60-65% for 24 hours.
The packing shall be done as possible on a packing table, but at least on a clean, antistatic
surface. The following photos below are from packling the Salvage SQ. We remind you
that you fly at your own risk. This also applies to the use of this life-saving device.
09. PACKING MANUAL
Before you start to pack, the Salvage SQ should be checked for any damage to the
canopy, the lines and the main riser. The lines should be checked for proper performance
and to unravel if necessary. The Salvage SQ is a square canopy and has four corners.