![Maber MB500/120-SP Instruction And Maintenance Manual Download Page 40](http://html.mh-extra.com/html/maber/mb500-120-sp/mb500-120-sp_instruction-and-maintenance-manual_685038040.webp)
40
-
Assemble the
unblocking
lever on the
chassis of the
transport drum
by fastening it
through
suitable
screws. This
position must
allow the
unblocking
lever to be
fitted in the
unblocking gate
box:
-
Load the safety
landing
gate
and the box
with
the
blocking gate
mechanism on
the
transport
drum.
-
Come back to
the
landing
floor.
-
Rotate
the
transport drum,
open
the
unloading
ramp
and
unload
the
saferty landing
gate at the
landing floor.
-
Assemble the
gate on the
scaffolding or
on the wall by
using
tubes
and
joints
assembled
before. Use all
possible safety
systems (use
the safety belts
to work in safe
conditions on
the scaffolding). Study the following picture for the correct position of the safety
landing gate:
COPY
Summary of Contents for MB500/120-SP
Page 32: ...32 28 ELECTRICAL DIAGRAM MB 500 120 SP RACK AND PINION HOIST ONE PHASE C O P Y ...
Page 36: ...36 C O P Y ...
Page 48: ...48 DISEGNI TECNICI TECHNICAL DRAWINGS DESSINS TECHNIQUES TECHNISCHE ZEICHNUNGEN C O P Y ...
Page 49: ...49 C O P Y ...
Page 50: ...50 C O P Y ...
Page 51: ...51 C O P Y ...
Page 52: ...52 C O P Y ...