![Maber MB500/120-SP Instruction And Maintenance Manual Download Page 23](http://html.mh-extra.com/html/maber/mb500-120-sp/mb500-120-sp_instruction-and-maintenance-manual_685038023.webp)
23
Place the element
(1)
by first loosing the screw
(3)
. Then place the element
(2)
and adjust
its distance. Fit elements
(1)
and
(2)
to a wall with wall-plugs or to a metal frame with
clamps able to bear the indicated loads. Check the vertical alignment of the machinery.
Loosen the screw
(3)
until it touches the pipe of the vertical column. This stiffens the
securing point. Do not secure near the corner for cement or similar structures.
Use M10 wall-plugs suitable both for the indicated loads and the type of wall material.
Should the lift be fitted on fixed scaffolds or a tubular scaffolds make sure that they can
bear the transmitted loads.
Warning!!!
Not to interfere with the bolts, fasten the release lever (a) of the turning plate
parallel to the deck wall.
COPY
Summary of Contents for MB500/120-SP
Page 32: ...32 28 ELECTRICAL DIAGRAM MB 500 120 SP RACK AND PINION HOIST ONE PHASE C O P Y ...
Page 36: ...36 C O P Y ...
Page 48: ...48 DISEGNI TECNICI TECHNICAL DRAWINGS DESSINS TECHNIQUES TECHNISCHE ZEICHNUNGEN C O P Y ...
Page 49: ...49 C O P Y ...
Page 50: ...50 C O P Y ...
Page 51: ...51 C O P Y ...
Page 52: ...52 C O P Y ...