3
MT-3000A PRE-INSTALLATION ASSEMBLY
All installations are unique in some way, which means it's OK to preassemble certain hardware, or rear-
range the assembly process to meet specific site requirements. A quick review of the assembly notes
and drawings should help firm up the appropriate strategy. Please remember to double-check all hard-
ware for tightness BEFORE it becomes inaccessible.
PRE-INSTALLATION TIPS AND CONSIDERATIONS:
The MT-3000AEL gear box is shipped dry without oil, see the gear box motor detail for filling instructions. The For
best results, test and calibrate the
MT-3000AEL
(positioner, cable, and control unit) on a work bench or tem-
porary foundation. This will familiarize you with the components and controls, their proper function, and allow test-
ing of the terminal wiring and connection. Upon completion, the positioner can be run to a known compass or land-