background image

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input voltage:  Check voltage across the terminal 

7 – 8 with a multimeter.

3) Feedback potentiometer:  Check voltage across the termi-

nals 9 – 11 to show approx. 3.3V and 10 – 11 within 0 to 

approx. 3.3V.

4) Output:  Check voltage across the output terminals.

MANUAL OPERATION

Even when there is no input signal from Modbus, there is 
the possibility to force the position to 0% or 100% using the 
manual operation switches (OPEN COM and CLOSE COM) 
in the panel accessible from the frontal side.
Manual operation switch has priority over the opening posi-
tion from Modbus, therefore, when the control is intended 
to be from Modbus, be sure to turn off the manual operation 
switch. 
Also turning both (open and close) switches on, both will be 
out of function.

ADJUSTMENTS

 

FULL-CLOSE POSITION

Turn manual close switch  on or apply 0% setpoint signal 
and adjust the 0% position with full-close position adj.   Ad-
justable within 0 to 25%.  (factory setting: 0%)

 

FULL-OPEN POSITION

Turn manual open switch on or apply 100% setpoint signal 
and adjust the 100% position with full-open position adj.  
Adjustable within 75 to 100%.  (factory setting: 100%)
Check once more full-close position and confirm there is no 
deviation, if so, adjust repeatedly.
After adjustment, be sure to turn off manual switches. 

 

DEADBAND

Protect from hunting, adjusting deadband switch to the 
most significant value available.  
It stops, immediately after a deviation goes into deadband 
range and the control will be recovered when it is out of the 
deadband range.

MEXM

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: [email protected]

EM-4610  Rev.1  P. 4 / 5

Reviews: