6 / 12
3
4
Install steel cross rods
Height adjustment
1
2
3
Remove the pre-installed
screws on rod B5 . Making
sure the upper poles B2
are aligned, slide rods B5
into the top openings .
Slide the upper poles B2 up or down
to the different spring plunger holes for
your desired height . Install grommet
covers B4 into the grommet holes .
Press and hold both spring
plungers to slide the upper
poles B2 .
Refasten rods B5
with screws .
Phillips
screwdriver
B5
B5
B5
B5
B2
B4
B4
B4
B4
46
1
⁄
2
˝ - 62
1
⁄
2
˝ H / 1050mm - 1500mm
Assistance
Required
Cables
Unplugged