Page
18
Installation- all Island hoods
Please note: All Luxair Islands are installed in ex actly the s ame manner
and it is
only the shape and design that
differ, please use the following steps for all Island
unit models
Please note that the installation of all
Island hoods should be
carried out
by at least two people.
1
Position the inner top section of
the
upper arm directly on the
ceiling
and above your hob and
mark the
center hole, also mark
fixing
positions. Make sure you are
center
to your hob.
2
Make sure that your fixings will
hold
at least 75kg in weight; this
must
also be flush with the ceiling.
Drill a
150mm hole in the ceiling
and
connect your ducting, run it to
the
outside wall, this must not
exceed
4mtrs in length.
3
Pass the ducting hose and
electrical
cable through the center
hole of the
Ceiling
top inner arm.
Proceed to secure the
arm to your
ceiling using either
coach screws
(provided) or coach
bolts (not
provided). It is paramount
that these fixings are strong
enough
to hold the weight of the
hood.
Warning:
All Island hood must be flush
mounted and under no
circumstances must the chimney be
inset into the ceiling void.