16 |
P a g e
INSTALLATION
MATERIALS & TOOLS
Each SILHOUETTE® Shading ordered should
include:
•
Installation brackets (see chart)
•
2 hold-down brackets (optional)
•
2 screws for each bracket (20mm x
6#Panhead)
TOOLS REQUIRED
•
Steel measuring tape
•
Carpenter’s level
•
Power or battery drill and bits
•
Flat blade and Phillips head screwdrivers