17
– Turn the crank (5) clockwise to evenly wind up
the steel cable.
Unwinding the cable under load (lowering,
unloading)
– Hold the crank (5) firmly and push gently to
relieve the ratchet lever (2).
– Place the ratchet lever (2) at Position
[A]
.
– Turn the crank anti-clockwise.
– The steel cable should be fully retracted again
after use.
Cleaning and maintenance
Cleaning and maintenance at a glance
After each use
Every 6 Months
Cleaning
Cleaning the product
– Remove coarse dirt.
– Wipe down the product with a slightly damp
cloth.
Storage and transport
Storage
• Store the product in the most horizontal position
possible.
Transport
– Use the original packaging to ship whenever
possible.
Disposal
Disposal of the appliance
This appliance must not be disposed of with regular
household waste! Dispose of the appliance in the
appropriate manner. For more information, consult
your community waste disposal service.
Disposal of the packaging
The packaging consists of cardboard and
correspondingly marked plastics that can
be recycled.
– Make these materials available for
recycling.
Technical data
DANGER! In the interests of your own
safety!
Perform only the maintenance work
described here yourself.
Any other work, especially repairs must be
performed by a trained professional.
Improper work can cause product damage
and hence physical injury.
What?
How?
Cleaning the product.
What?
How?
Grease axle bolt and ca-
ble.
Lubricate components
with standard bearing
grease
DANGER! Risk of injury!
Make sure that
unauthorized persons do not have access
to the product!
Material number
389 828
389 829
Maximum load
360 kg
720 kg
Cable length
10 m
10 m
Weight
2.25 kg
3.25 kg
GB
Seilzug_389828_389829.book Seite 17 Dienstag, 12. April 2016 2:35 14
Summary of Contents for 389 828
Page 2: ...2 1 2 3 4 5 6 1 5 3 2 Seilzug_389828_389829 book Seite 2 Dienstag 12 April 2016 2 35 14 ...
Page 3: ...3 2 3 2 A B 4 Seilzug_389828_389829 book Seite 3 Dienstag 12 April 2016 2 35 14 ...
Page 4: ...4 5 6 Seilzug_389828_389829 book Seite 4 Dienstag 12 April 2016 2 35 14 ...
Page 51: ...51 Seilzug_389828_389829 book Seite 51 Dienstag 12 April 2016 2 35 14 ...