Completion and pres treating woodwork

8.

Once you have completed the window and door fittings, fix the facing panels to the frames to cover the slits
above the windows inside the cabin. We stress the importance of mounting them on the framework and

on

the wall timbers, to allow the structure room to "settle".

not

Please note that we have designed the windows with removable crossbars, to make cleaning the window or
painting the frame easier. Care should be taken when removing and replacing the window cross, since it is a
tight fit.

Regular visual checks help to avoid damage before it occurs. Please remember that fitting adjustments to the
different parts are an unavoidable part of the care programme.

We wish you a lot of pleasure from your Lillevilla 100.

We reserve the right to amend the technical specification.

Treatment and painting must be done twice immediately after building up the house. It

s very important to use

treatment fluid including protection against moulding and blue stain (please ask further advise from the seller
of the treatment fluid). Follow the instructions of the producer of the treatment fluid. The best result will be
achieved in dry circumstances when the temperature is over +5 ºC. Doors and windows must be treated from
both sides. The building needs to be treated also with protection against blue stain and moulding (specially the
corners). Treatments both in and outside must be renewed regularly following the instructions of the producer
of the protective liquid. Follow carefully the condition of the South side wall, because ultraviolet radiation
effects more to it than to the other walls.

In despite of the treatment, moisture can get in from corners, knots, splits and joints of the parts. If needed, you
can prohibit this with silicon, for example.

Note that split knots of light log houses can let protection material flow and make tracks to the other side.
Water absorbs to the wood construction easiest through the heads of the timber (ends of logs and fascia
boards). So treat these points with great care and often enough. Also other timber parts being under heavy
strain of weather and wear (fascia boards, wind covering boards, parapets and facing planks of the terrace)
should be treated quite often, yearly if necessary.

It is recommended to install

venthole gratings (not included) at the top of gable triangles to let extra moisture out.

It is very important to make sure the ventilation works, also under the house.

12

Lillevilla 100 C-3 English 220109

Summary of Contents for Lillevilla 100 C-3

Page 1: ...m x 135 mm 5650 mm x 3900 mm 6090 mm x 5210 mm 34 8 m 3450 mm 895 mm x 1820 mm 1190 mm x 870 mm 640 mm x 640 mm 640 mm x 870 mm 2350 mm 64 m 2 packages 1450 kg 980kg Lillevilla 100 C 3 English 220109 1 The roof tiles are for illustration purposes only Guarantee number Controlled by Important Keep this Ground plan Foundation plan The terrace as an option 5650 mm x 3900 mm Wall thickness 45 mm ...

Page 2: ...has been erected and the weather is fine However if you wish to paint odd parts in different colours this should be done before the cabin is assembled adequate ventilation and avoiding waterlogging are still the best ways of protecting wood against rot Teknogrund treated parts That means that the untreated wood will turn greyish over the years something which you might choose Please check the cont...

Page 3: ...3 A C 1 4 Lillevilla 100 C 3 English 220109 ...

Page 4: ...ENSIONS INSIDE 3365X3810 DIMENSIONS INSIDE 2150X2280 DIMENSIONS INSIDE 2150X1485 1 D F E Door E2 Door C drilling for the threaded rod drilling for the threaded rod drilling for the threaded rod Lillevilla 100 C 3 English 220109 ...

Page 5: ... 1 2 metres empty space to the place of the walls in order to be able to work according to Handle the logs of the front and back walls very carefully The logs are 5 85 metres long and they have three timberlinings so theywillbreakeasilyifstressed paralleltothebreast Begin the erection by putting 11 foundation beams on the bottom area of the cabin as shown in Note slot the outer foundation beams fo...

Page 6: ... the outer bottom boards are placed about 10 mm inwards from the side walls There are two reasons for this if it rains the area between the bottom board and the first walllog willstaydry Theouterbottomboards willalsofunctionassupporting edgesfor thefloorboards When the lowest log framework is assembled check that it is in right angle by measuring it from corner to corner and attach the bottom logs...

Page 7: ...ing sure that they do not fall down Please make sure to install the windows rightsideup Ifinstalledupside down thewindow willfallwhenopened Continue assembling the walls according to the wall diagrams Please note that the last logs at the front andrearwallsarelonger Note A8 C3 When you have completed the walls assemble the to their places It is advisable to have 1 or 2 persons helping you and to m...

Page 8: ...all Check that it stands vertical and fix with a couple of screws to the wall timber Please ensure that K1 is fixed to the middle point of the entrance If not fixed to themiddlepoint theridgepurlinwillnotfitintoit The sleeping loft 3 Storm bars threaded rods 4 Although Lillevilla cabin is very stable it is advisable to protect the structure against strong winds with so called storm bars threaded r...

Page 9: ...oards fiteasilytotheirplaces Inamoistweathertheinstallationcanbetight The floor area is 3 81 m deep so the floor boards can shrink or expand parallel to the side walls 4 6 mm Therefore Note that the wood will shrink very little lengthwise only a tolerance of 2 5 mm is necessary betweenthesidewallsandthefloor When the floor boards are in their places fasten them to the bottom boards with nails foll...

Page 10: ...asten them with nails to the side walls and all three purlins Again it is advisable to leave a space of 1 1 5 mm between the boards because the wood shrinks and expands accordingtotheweather When you are fastening do not nail it immediately but check first how far it reaches and saw awaytheextrapart ifnecessaryaccordingto When both sides of the roof are finished fasten the BE CAREFUL WHEN INSTALLI...

Page 11: ...t way of protecting theroofplanksfromdampness Fasten the felt on the eaves very carefully with nails at intervals of 10 cm in order to prevent the wind from lifting the felt Fasten then the next felts with an overlap of appr 10 cm Continue installing the asphalt felt in numerical order shown in the The ridge felt is folded in the middle and fastened with nails in bothsides andinthemiddle Thenyou c...

Page 12: ... will be achieved in dry circumstances when the temperature is over 5 ºC Doors and windows must be treated from both sides The building needs to be treated also with protection against blue stain and moulding specially the corners Treatments both in and outside must be renewed regularly following the instructions of the producer of the protective liquid Follow carefully the condition of the South ...

Page 13: ... x 2440 15 B2 Log 45 x 135 x 2440 1 B3 Log 45 x 65 x 245 2 B4 Log 45 x 67 x 5850 1 C1 Log 45 x 135 x 5850 16 C2 Log 45 x 145 x 6050 1 C3 Log pre drilled 45 x 135 x 4100 10 D1 Log pre drilled 45 x 135 x 1775 7 D2 Log pre drilled 45 x 135 x 1120 7 D3 Gable triangle pre drilled 45 x 540 x 3810 1 D4 Gable triangle 45 x 540 x 2031 1 D5 Log 45 x 135 x 4100 1 E1 Log 45 x 135 x 245 13 E2 Log 45 x 135 x 14...

Page 14: ...190 x 870 3 J2 Window type E 640 x 870 1 J3 Door type C 890 x 1820 1 J4 Door type E2 low glass 890 x 1820 1 J5 Facing panel for window 20 x 95 x 750 2 J6 Facing panel for window 20 x 95 x 690 2 J7 Facing panel for window 20 x 95 x 1300 3 J8 Facing panel for window 20 x 95 x 1250 3 J9 U post 34 x 65 x 1860 2 L1 U post 34 x 65 x 940 1 L2 Roofing felt 19 m 2 rolls Roofing felt 7 5 m 1 roll Nails scre...