background image

LUMASCAPE ASIA PACIFIC

  Brisbane Technology Park, 18 Brandl Street, Eight Mile Plains, QLD 4113, Australia

Phone +61 7 3854 5000 | Fax +61 7 3854 5001 | Email: [email protected]

www.lumacape.com

LUMASCAPE NORTH AMERICA

  1300 Industrial Road, Unit #19, San Carlos, CA 94070, USA

Phone +1 650 595 5862 | Fax +1 650 595 5820 | Email: [email protected]

www.lumacape.com

Products and specifications are subject to change without notice.

6 / 7

 IN0167 181126 CE UL

INSTALLATION INSTRUCTIONS

INGROUND / INGRADE
LED UPLIGHT

USA I Australia I Asia I Middle East I Europe

Erden 

E8

 

LS3080

Installation

Step 2

Step 1

Layout luminaire locations as required.  
Use discretion in placement as 
luminaire may become hot and could 
burn.  Luminaire cavity should be 
as shown.  Ensure gravel or similar 
medium forms the bottom of the cavity 
to allow drainage.

Note:

  Always check luminaire lable for 

correct supply details and lamp type if 
applicable.

Position and use screws to attach 
brackets at the bottom of the mounting 
collar before concrete is poured.

Fit sleeve, collar and cover plate.
• 

Fit sleeve and collar over foam 
plug.

• 

Ensure enough cable is in the 
cavity to connect to luminaire.

• 

Position top surface of the 
mounting collar to be flush with  
final surface level.

• 

Screw cover plate to mounting 
collar.

• 

Ensure ample depth for fitting.

Step 5

Step 6

Step 4

Pour concrete.  Check that the top 
surface of the mounting collar is flush 
with the finished surface level.

When ready to install luminaire;
• 

Destroy foam plug and assemble 
luminaire.

• 

Remove cover plate, glass and  
seal. 

Connect cable / hookup wire in 
accordance with local wiring rules.

IMPORTANT:

 Power supply must 

be isolated prior to connection or 
disconnection of cables.  Failure to do 
so will result in damage to the luminaire 
components.

IP68

Step 3

gravel

hole 

10.3”

Ø262mm

finished surface

19

.4” 

(494mm)

Finished 
Surface 
Level

Factory 
supplied 
anti-leach 
cable

Minimum length of 
cable protruding 
from the ground to 
be 100mm.

Summary of Contents for LS3080

Page 1: ...before installation or maintenance may result in fire serious injury electric shock death and may damage the luminaire READ ALL SAFETY INSTRUCTIONS FIRST Warranty Void if not installed as per installation instructions and in compliance with the local electrical code N653 LS3080 LS640 K84 Pre Installation Follow instructions carefully failure to do so will void warranty Ensure installation complies...

Page 2: ...uminaire to allow for adequate drainage Poured Concrete Temporary Cover Keep on pre instalation kit in order to avoid concrete and debris from entering the cavity Remove when ready to installl luminaire 1 Entire Rubber Lid Seal 2 Luminaire Flange 3 Luminaire Lid Uderside torque order 1 2 6 5 3 4 Aiming Luminaire Ensure all Sealing Surfaces are Clean A 2 3 1 C B D D A Aim Mark Point in the directio...

Page 3: ...IONS INGROUND INGRADE LED UPLIGHT USA I Australia I Asia I Middle East I Europe Erden E8 LS3080 Component Overview Installation Preparation WARNING The luminaire should only be used complete with its protective shield cover Keep electronics free from dirt and moisture Luminaires can become very hot Use discretion in placement No power tools to be used Do not shorten or interfere with cable assembl...

Page 4: ... to next PowerSync Data Injector Up to 45 luminaires per run Max run length 492ft 150m Consult voltage drop and run length tables for specific limitations When no data injector is in use non dimming applications isolate data wire When no data injector is in use non dimming applications isolate data wire For last luminaire in the circuit install terminating resistor in parallel across the data wire...

Page 5: ...ns Always observe NEC branch circuit current limitations When no data injector is in use non dimming applications isolate data wire When no data injector is in use non dimming applications isolate data wire For last luminaire in the circuit install terminating resistor in parallel across the data wire and earth wire 120 277 V 50 60 Hz Junction Box Junction Box Termination Junction box or other app...

Page 6: ...y details and lamp type if applicable Position and use screws to attach brackets at the bottom of the mounting collar before concrete is poured Fit sleeve collar and cover plate Fit sleeve and collar over foam plug Ensure enough cable is in the cavity to connect to luminaire Position top surface of the mounting collar to be flush with final surface level Screw cover plate to mounting collar Ensure...

Page 7: ...ard pressure on gimbal tighten rotational lock grub screw Lay lid partially over luminaire to allow a gap for any moisture present to evaporate prior to sealing Connect to supply and allow to burn for 2 hours IMPORTANT Do not energise without partially covering gimbal Alternatively using heat gun set at 100 C heat the inside of luminaire at a distance of 300mm away for 10 minutes Seal immediately ...

Reviews: