
Replacing a Fuse
A-8
PortMaster Office Router Hardware Installation Guide
Replacing a Fuse
If the Office Router loses power while connected to an active power source, check the
fuse.
Follow these instructions to check and replace the fuse in the Office Router.
Required Equipment
•
5/32-inch flathead screwdriver
•
250V, 2A fuse
Procedure
1.
Turn the power switch off and disconnect the Office Router from the
power source.
2.
Detach the power cord from the Office Router.
3.
Insert a 5/32-inch flathead screwdriver between the fuse door and the
chassis, and gently pull the fuse door open.
S1 - PC-Card
Ethernet
S0
1186_0021
1186-0021
1186-0017
Summary of Contents for PortMaster OR-HS
Page 4: ......
Page 18: ...1 2 PortMaster Office Router Hardware Installation Guide ...
Page 36: ...Connect an External Modem Optional 2 18 PortMaster Office Router Hardware Installation Guide ...
Page 46: ...Replacing a Fuse A 10 PortMaster Office Router Hardware Installation Guide ...
Page 54: ...Ordering Instructions B 8 PortMaster Office Router Hardware Installation Guide ...
Page 70: ...Index Index 4 PortMaster Office Router Hardware Installation Guide ...